Key Facts

Adopted plumbing code
Standard Plumbing Code (state edition)
Adopting authority
Georgia Dept. of Community Affairs
Permit review agency
Community Development plus health dept.
Permit validity
Voids if work not started in 6 months
General code penalty
Up to $1,000 fine or 6 months jail

Summary

Every plumbing installation in unincorporated Troup County, from fixtures to water and sewer connections, must comply with the Standard Plumbing Code as adopted and amended by the Georgia Department of Community Affairs, applied under Unified Development Ordinance Appendix C Section 1.3(4)(a)(vi) and permitted through the Community Development Department.

These county ordinances apply to unincorporated areas of Troup County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Sec. 1.3. - Code declared remedial. ... (4)Scope.(a)Applicability.(i)Generally. Where, in any specific case, different sections of these construction codes specify different materials, methods of construction or other requirements, the most restrictive shall govern. Where there is a conflict between a general requirement and a specific requirement, the specific requirement shall be applicable. ... (vi)Plumbing. The provisions of the Standard Plumbing Code, as adopted and amended by the state department of community affairs, shall apply to every plumbing installation, including alterations, repairs, replacement, equipment, appliances, fixtures, fittings and appurtenances, and when connected to a water or sewer system.

Full Breakdown

Section 1.3 of Appendix C declares the County's construction codes remedial, meaning they are to be read broadly to protect public health and safety, and subsection (4)(a)(vi) specifically applies the Standard Plumbing Code, as adopted and amended by the state Department of Community Affairs, to every plumbing installation connected to a water or sewer system, including alterations, repairs, replacement, equipment, appliances, fixtures, fittings and appurtenances. Because the substantive plumbing standard is the state-adopted minimum code, the County does not publish its own fixture counts or pipe-sizing tables; it instead enforces whichever edition the Department of Community Affairs currently has in force.

Before plumbing work begins, Section 2.1 requires a permit application, and where the work is tied to construction of a building or mobile home, the Community Development Director forwards the application to the health department and any other department whose approval is necessary before a permit issues; a permit becomes invalid if construction does not start within six months. Section 1.5 allows repairs or alterations to an existing plumbing system without bringing the whole system up to new-construction standards, provided the work itself meets current code, with the Community Development Director deciding how far compliance must extend.

Section 1.7 gives the Director inspection authority, the power to issue a stop-work order for plumbing work done contrary to the code or in a dangerous manner, and authority to revoke a permit obtained through a false statement.

Violations & Fines

Unpermitted plumbing work, or plumbing installed contrary to the adopted Standard Plumbing Code, can be halted by a stop-work order under Section 1.7(3), and the permit can be revoked under Section 1.7(4) for a false application or a code violation. As part of the County Code, an uncorrected violation also falls under the general penalty in Section 1-19: a fine of up to $1,000.00, imprisonment up to six months, or both, with each day a separate offense.

Frequently Asked Questions

What plumbing code applies to unincorporated Troup County?
The Standard Plumbing Code as adopted and amended by the Georgia Department of Community Affairs, applied under Unified Development Ordinance Appendix C Section 1.3(4)(a)(vi) to every plumbing installation connected to water or sewer service.
Does the health department review plumbing permits in Troup County?
Yes. Section 2.1 requires the Community Development Director to forward building and mobile home permit applications, which include plumbing work, to the health department and any other department whose approval is needed before the permit issues.
How long is a Troup County plumbing permit valid before work must start?
Six months. Section 2.1(1)(c) makes a building or mobile home permit, including the plumbing work covered by it, invalid if construction has not begun within six months of issuance.

Sources & Official References

Other rules in Troup County

All Troup County rules

Compare Troup County to another location·View the Georgia building safety overview

Get notified when Plumbing Permits in Troup County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.