Skip to main content
CityRuleLookup

Bossier City, LA Building Setbacks & Zoning: Lot Coverage Limits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

R-A landscape minimum
80% of lot area
R-E landscape minimum
60% of lot area
R-MD landscape minimum
15% of lot area
R-HD landscape minimum
10% of lot area
Industrial districts
No minimum landscape surface required

Summary

Bossier City doesn't cap lot coverage with a stated percentage; instead the Unified Development Code sets a minimum landscape surface requirement by zoning district under Section 6.4. R-A lots must keep 80 percent as landscape surface, R-E 60 percent, R-MD 15 percent and R-HD only 10 percent, which functions as the real ceiling on paving and building footprint.

District Lot Width Minimum Bldg. Setback Required Maximum Yard Permitted Minimum Landscape Surface Front Side Rear Front Side R- ... A Residence-Agriculture 100 ft. 25 ft. 10 ft. 25 ft. n/a 80% of lot area R-E Residential Estate 70 ft. 40 ft. 10 ft. 25 ft. 60% of lot area R-LD Residential, Low Density and R-MHS; Residential Manufactured Housing Subdivision 60 ft. 25 ft. 5 ft. 20 ft. 30% of lot area R-MD Residential, Medium Density 60 ft. 25 ft. 5 ft. 25 ft. 15% of lot area R-HD Residential, High Density 60 ft. 25 ft. 5 ft. 25 ft. 10% of lot area ... B-1 Business, Commercial Office 60 ft. 25 ft. 10 ft. 25 ft. n/a 20% of lot area B-2 Limited Business 60 ft. 25 ft. 10 ft. 25 ft. 20% of lot area B-3 General Business 60 ft. 35 ft. 10 ft. 25 ft. 15% of lot area B- ... 5 Interchange Business 100 ft. 40 ft. 20 ft. 25 ft. 20% of lot area I- ... 1 Light Industrial 100 ft. 25 ft. 10 ft. 25 ft. n/a None I-2 Heavy Industrial 100 ft. 25 ft. 10 ft. 25 ft. None

Full Breakdown

UDC Section 6.4, Yard Requirements, requires "all structures... comply with the minimum and maximum yard requirements and unpaved area ('landscape surface') contained in the following table," except where Section 15.4 provides otherwise. Rather than stating a maximum building or impervious coverage percentage directly, the table sets a Minimum Landscape Surface percentage of lot area for each district, which caps how much of the lot can be covered by structures, driveways and paving. The residential range runs wide: R-A Residence-Agriculture requires 80 percent minimum landscape surface, R-E Residential Estate 60 percent, R-LD Low Density and R-MHS Manufactured Housing Subdivision 30 percent, R-MD Medium Density 15 percent, and R-HD High Density only 10 percent, reflecting each district's intended density.

Commercial districts run lower still: B-1 and B-2 require 20 percent, B-3 General Business 15 percent, and B-5 Interchange Business 20 percent, while I-1 and I-2 industrial districts carry no minimum landscape surface requirement at all ("None"), letting those lots be covered edge to edge subject only to setbacks. The percentage is measured against total lot area, so a larger lot in a low-percentage district can still carry more paved or built area than a compliant lot in a high-percentage residential district.

Violations & Fines

Site plans or building permits that don't reserve the required landscape surface percentage are subject to denial by the Metropolitan Planning Commission and, if built anyway, enforcement as a UDC Section 17.7.1 misdemeanor: up to a $500 fine, up to 30 days in jail, or both, with each day of continued noncompliance a separate offense.

Frequently Asked Questions

Does Bossier City set a maximum lot coverage percentage?
Not directly. UDC Section 6.4 instead sets a Minimum Landscape Surface percentage that every lot must keep unpaved and unbuilt, by district, which works as the practical ceiling on how much of a lot can be covered by structures and paving.
How much of my R-MD lot can I pave or build on?
R-MD Residential, Medium Density requires a minimum 15 percent landscape surface under Section 6.4. The remainder of the lot may carry structures, driveways and other paved surfaces, subject to the district's separate front, side and rear setback requirements.
Which districts have no landscape surface minimum?
I-1 Light Industrial and I-2 Heavy Industrial carry no minimum landscape surface requirement under Section 6.4's table, meaning those lots can be covered by buildings and pavement edge to edge, subject only to the district's setback lines.

Sources & Official References

Other rules in Bossier City

All Bossier City rules

Compare Bossier City to another location·View the Louisiana building setbacks & zoning overview

Get notified when Lot Coverage Limits in Bossier City, LA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.