Broomfield, CO Building Setbacks & Zoning: Lot Coverage Limits (2026)
Key Facts
- Lot coverage cap
- 20% of lot area
- Building footprint cap
- 10,000 sq ft
- Combined coverage cap
- 60% of land area
- Minimum lot size
- 1 acre
- Max building height
- 35 feet
- Minimum open area
- 40%
Summary
In Broomfield's Transitional Overlay Area District, section 17-25.1-050(B) caps total lot coverage at 20% of the lot, limits any single building footprint to 10,000 square feet, and caps combined building and parking coverage at 60% of the gross land area.
17-25.1-050 - Development requirements. ... (B)Lot coverage. Total lot coverage for all built structures, including accessory buildings, shall not exceed 20% of the total lot area. The footprint of any structure shall not exceed 10,000 square feet. Total building and parking coverage shall not exceed 60% of the gross land area.
Full Breakdown
The Transitional Overlay Area District applies to rural residential neighborhoods adjacent to principal arterial streets identified in the Broomfield Comprehensive Plan, under section 17-25.1-010, and its rules under section 17-25.1-040 supersede the underlying zone district's requirements where they conflict. Section 17-25.1-050(B) caps total lot coverage for all built structures, including accessory buildings, at 20% of the total lot area, with no single building footprint exceeding 10,000 square feet, and combined building and parking coverage held to 60% of the gross land area. The same section pairs the coverage cap with a one-acre minimum lot size under subsection (C), a 20,000-square-foot maximum building size under subsection (D), a 35-foot maximum building height under subsection (E), and a building mass limit of no more than 150 feet in length or width under subsection (F).
A comparable but separate coverage rule applies in the older Neighborhood Overlay Area under section 17-25-050(A)(1): single-family lot coverage there is capped at 2,500 square feet on lots up to 7,000 square feet, or 35% of lot area on larger lots, a tighter residential-only standard distinct from the transitional overlay's 20%/60% commercial-and-residential coverage formula. Development within the transitional overlay must also provide a minimum of 40% open area under section 17-25.1-050(L)(4) and set buildings and parking back at least 40 feet from the arterial street.
Violations & Fines
Exceeding the 20% lot coverage cap, the 10,000-square-foot footprint limit, or the 60% combined coverage cap in the transitional overlay is enforced under chapter 17-50: the building official can order a noncompliant structure corrected under section 17-50-040, and failure to comply within ten days is a misdemeanor under section 17-50-050, carrying the chapter 1-12 penalty of up to $2,650 or 364 days in jail.
Frequently Asked Questions
What is the lot coverage limit in Broomfield's transitional overlay?
Does the 20% cap include parking areas?
Is the transitional overlay coverage rule the same as the neighborhood overlay's?
What other development limits pair with the lot coverage cap?
Sources & Official References
Other rules in Broomfield
Compare Broomfield to another location·View the Colorado building setbacks & zoning overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.