Broomfield, CO Building Setbacks & Zoning: Setback Rules (2026)
Key Facts
- Minimum lot area
- 2.25 acres
- Front yard
- 50 feet
- Rear yard
- 150 feet
- Side yard (principal)
- 25 feet
- Side yard (accessory)
- 20 feet
- Max building height
- 33 feet
Summary
Broomfield's Rural Residential (RR) zone carries the city's largest yard setbacks: a 50-foot front yard, 150-foot rear yard, and 25-foot side yard for the principal building on a minimum 2.25-acre lot. Accessory buildings need a 150-foot rear yard and 20-foot side yard under section 17-09-040.
17-09-040 - Lot and yard requirements. The following are the minimum lot and yard requirements in the RR district:
(A)Principal building:
Area Minimum Requirement Lot area 2.25 acres Lot width 200 feet Lot depth 330 feet Front yard 50 feet Rear yard 150 feet Side yard 25 feet Minimum floor area 1,400 square feet
Full Breakdown
Section 17-09-040 sets the minimum lot and yard requirements for the RR Rural Residential District, the zone intended under section 17-09-010 for large single-family lots that preserve a rural environment. A principal building needs a lot of at least 2.25 acres, 200 feet wide and 330 feet deep, with a 50-foot front yard, a 150-foot rear yard, a 25-foot side yard, and a minimum floor area of 1,400 square feet. Accessory buildings share the 150-foot rear yard but only need a 20-foot side yard, capped at 2,500 square feet of floor area.
Section 17-09-050 measures building height under section 17-38-320(F) and caps it at 33 feet. Section 17-09-060 layers on additional RR-specific rules: off-street parking under section 17-32-040, the sign code in chapter 17-44, and the fences, hedges, and walls provisions of section 17-32-140 all apply, local streets must meet the rural road section of the city's standards and specifications adopted in chapter 14-04, and a connection to the city water and wastewater systems is required unless the city council expressly grants an exemption. The land use review commission may approve variations to the lot and yard requirements as a use permitted by special review where buildings are clustered to preserve common open areas.
Violations & Fines
Community Development enforces RR setbacks through chapter 17-50. The building official may order removal of an encroaching structure under section 17-50-040, and noncompliance within ten days after that order is a misdemeanor under section 17-50-050, punishable under chapter 1-12 by a fine up to $2,650 or up to 364 days in jail, with each day of the violation a separate offense.
Frequently Asked Questions
What is the front yard setback in Broomfield's RR district?
How deep must the rear yard be in the RR district?
Can Broomfield reduce RR setbacks for clustered development?
What happens if a structure violates the RR setback rules?
Sources & Official References
Other rules in Broomfield
Compare Broomfield to another location·View the Colorado building setbacks & zoning overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.