Skip to main content

Southborough, MA Building Setbacks & Zoning: Lot Coverage Limits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Impervious threshold
More than 75% of lot area needs a special permit
Permit authority
Board of Appeals under § 174-13.4(C)(1)
Agency review period
35 days; silence indicates approval
Referral agencies
Planning Board, Conservation Commission, Board of Health, Building Inspector
Residential tables
Floor area ratio, no lot coverage percentage
Maximum fine
$300 per offense, each day separate

Summary

Southborough requires a special permit from the Board of Appeals before anyone renders impervious more than 75% of lot area, under § 174-13.4(B)(1)(c). The Residence A and Residence B tables use a floor area ratio instead of a lot coverage percentage.

B. Uses requiring special permits. (1) The following shall be allowed only if granted a special permit from the special permit granting authority: ... (c) Rendering impervious more than 75% of lot area. ... (2) Change in activity resulting in crossing any of the thresholds of B(1)(a) through (d) shall constitute a change of use requiring a special permit. C. Special permit process. (1) Authority and procedure. The special permit granting authority (SPGA) shall be the Board of Appeals.

Full Breakdown

Section 174-13.4, Water resource protection, lists the uses that shall be allowed only if granted a special permit from the special permit granting authority. One entry is "Rendering impervious more than 75% of lot area." Subsection B(2) adds that a change in activity resulting in crossing any of the thresholds of B(1)(a) through (d) constitutes a change of use requiring a special permit. Under § 174-13.4(C)(1) the special permit granting authority is the Board of Appeals.

The Board of Appeals sends one copy of the application each to the Planning Board, the Conservation Commission, the Board of Health and the Building Inspector for written recommendations, and failure to respond within 35 days of transmittal indicates approval by those agencies. A permit is granted only if the Board determines there is adequate assurance of no violation of the Massachusetts Surface Water Quality Standards (314 CMR 4.00) and that groundwater quality will not fall below federal or state standards for drinking water.

The same section ties drainage to impervious surfaces. Section 174-13.4(A)(3) says provision shall be made for on-site recharge of all stormwater runoff from impervious surfaces unless, following consultation with the Conservation Commission, the Building Inspector determines that recharge is infeasible because of site conditions or undesirable because of uncontrollable risks to water quality. Subsection A applies to all new nonresidential construction.

The Residence A and Residence B development standards in § 174-8.2(D) and § 174-8.3(D) list lot area, frontage, setbacks, height and a maximum floor area ratio, not a lot coverage percentage. Separately, the lower impact development bylaw in § 174-13.3 applies to activity that will result in soil disturbance of one acre or more, and presumes a redevelopment project meets its requirements if total impervious cover is reduced by 40% from existing conditions.

Violations & Fines

The Building Inspector, acting as Zoning Enforcement Officer, enforces Chapter 174 under § 174-24. A person who violates the bylaw, a permit condition or a Board of Appeals decision is punished by a fine not exceeding $300 for each offense, and each day the violation continues is a separate offense. The Zoning Enforcement Officer can also use noncriminal disposition under MGL c. 40, § 21D.

Frequently Asked Questions

Is there a maximum lot coverage percentage for a house in Southborough?
The Residence A and Residence B standards in § 174-8.2(D) and § 174-8.3(D) do not print one. They list lot area, frontage, setbacks, height and a maximum floor area ratio. The impervious figure that does appear is in § 174-13.4(B)(1)(c), which requires a special permit to render impervious more than 75% of lot area.
Who grants the impervious surface special permit?
The Board of Appeals. Section 174-13.4(C)(1) makes it the special permit granting authority and requires it to transmit the application to the Planning Board, the Conservation Commission, the Board of Health and the Building Inspector, whose silence for 35 days indicates approval.
What happens to stormwater from paved areas?
For new nonresidential construction, § 174-13.4(A)(3) says provision shall be made for on-site recharge of all stormwater runoff from impervious surfaces. The exception is where the Building Inspector, after consulting the Conservation Commission, determines recharge is infeasible because of site conditions or undesirable because of uncontrollable risks to water quality.
Does the one-acre stormwater bylaw apply to a small lot?
Section 174-13.3 applies to activity resulting in soil disturbance of one acre or more, and its exemptions include any activity that will disturb an area less than one acre. A typical house lot below that size is outside it, but the 75% impervious rule in § 174-13.4 is a separate trigger.

Sources & Official References

Other rules in Southborough

All Southborough rules

Compare Southborough to another location·View the Massachusetts building setbacks & zoning overview

Get notified when Lot Coverage Limits in Southborough, MA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Lot Coverage Limits in Nearby Cities

How other cities in this county handle lot coverage limits.

Leominster, MA
Some Restrictions