Environmental Rules in Conway, AR (2026)
4 verified environmental rules for Conway, Arkansas, sourced directly from the municipal code and official government pages.
Verified from official government sources
Stormwater Management
In the City of Conway, Arkansas, any clearing, grading, excavation or land-altering activity that disturbs bare soil, changes slope contours or reroutes drainage must have a city-issued permit before work starts. A Grading Permit covers any site over one acre; subdivisions and residential builds use separate permit tracks instead.
Stormwater Permit Rules in Conway, Arkansas
Some RestrictionsConway Municipal Code § 10.50.03
A.Applicability. Any clearing, grading, excavation, development, or other land altering activity that may result in any of the following impacts shall have been issued one (1) of the city-issued permits described in subsection (d) of this section prior to the start of the activity.1.Disturbance of the ground surface layer exposing bare soil to the effects of erosion and allowing transport of se...
Erosion Control
In the City of Conway, Arkansas, every permitted construction site, including single-family builds, must keep erosion and sediment controls in place until the site is stabilized and a Certificate of Occupancy issues. Sites must grade to at least a 2 percent slope toward drainage infrastructure, and disturbed soil left idle 14 days must be stabilized.
Construction Erosion Control Rules in Conway, AR
Some RestrictionsConway Municipal Code § 10.50.05
A.Project Site Responsibility. Site responsibility shall be handled in accordance with section 10.50.03(c). In addition, the construction contractor shall be responsible for ensuring erosion and sediment control measures are implemented and maintained until the site is stabilized and a Certificate of Occupancy (CO) is issued. This responsibility includes preventing adverse impacts from storm wa...
Flood Zones
In the City of Conway, Arkansas, land-altering work on any site inside a designated floodplain needs a Floodplain Development Permit instead of the standard Grading Permit. The permit and review process runs under the city's separate floodplain ordinance, O-09-15, and the property may also need Development Review or a Building Permit.
Floodplain Development Permit in Conway, Arkansas
Some RestrictionsConway Municipal Code § 10.50.03(D)(4)
D.City-Issued Permits. The specific city-issued permit applicable to the type of land altering activity and/or project site location are as follows. ... 4.Floodplain Development Permit—Required for land altering activity on sites located within a designated floodplain. The permit and review processes are governed by City of Conway Ordinance O-09-15. (Issued in lieu of the Grading Permit, sites ...
Boat Dock Permits
In the City of Conway, Arkansas, private boat docks, boathouses, and piers at Beaverfork Lake need written City Council approval and an annual permit under Conway Municipal Code § 12.12.22. Boathouses and docks are capped at 26 by 30 feet, piers at 6 by 40 feet, and the annual boat dock permit costs $100 under § 12.12.26.
Beaverfork Lake Boat Dock Permit Rules
Significant RestrictionsConway Municipal Code § 12.12.22(A)(1); § 12.12.26
A.Structures into the lake.1.Boat houses, boat docks, and piers: Boat houses (not to include sleeping, toilet, cooking, or living facilities), boat docks, or piers for private adjacent landowners may be constructed if the structure is a minimum of one hundred (100) linear ft. from any other existing structure in the lake and if application has been made and written approval granted by the City ...
Looking for Faulkner County county-wide rules?
County ordinances apply to unincorporated areas and may supplement Conway city rules.
Environmental Rules in Faulkner County →