Environmental Rules in Kissimmee, FL (2026)
4 verified environmental rules for Kissimmee, Florida, sourced directly from the municipal code and official government pages.
Verified from official government sources
Stormwater Management
Kissimmee prohibits illegal connections and discharges to its storm sewer system, and requires construction, commercial, and industrial sites to control runoff and file erosion-control plans.
Kissimmee Illegal Stormwater Discharge Ban
Some RestrictionsKissimmee City Code § 22-85
Illegal connections and illegal discharges are prohibited. Owners and/or persons responsible for or currently operating an illegal connection or illegal discharge shall immediately stop and provide corrective measures in accordance with section 22-89.
Erosion Control
Kissimmee requires an early land preparation or site improvement permit before any grading, tree removal, or vegetation clearing, with limited exemptions for small residential lots and agriculture.
Kissimmee Grading and Drainage Permit Rule
Some RestrictionsKissimmee Land Development Code § 14-9-4.A
An approved early land preparation permit or a city approved site improvement permit is required prior to any alteration of terrain, removal of trees, or removal of vegetative cover from land within the city except for: 1. Residential lots. Alteration of terrain or removal of vegetation on residential lots of less than two acres, except those intended for a townhouse or multiple family housing ...
Flood Zones
Kissimmee requires a floodplain development permit for construction, filling, or grading in FEMA-mapped flood hazard areas, with new lowest floors set at least 18 inches above base flood elevation.
Kissimmee Floodplain Development Permit Rule
Some RestrictionsKissimmee Land Development Code § 14-9-1.G.1
Filling. Whenever a plan is submitted for an area that is a special flood hazard area but not in a floodway, the city may approve such subdivision, to an elevation sufficient to place the lowest floor, including basement, at a minimum of 18 inches above the base flood elevation of the 100-year frequency flood as determined by the city engineer or otherwise complies with [sub]section K.3.e.
Flood Elevation Requirements
Kissimmee requires fill in special flood hazard subdivisions to raise the lowest floor at least 18 inches above the 100-year base flood elevation, exceeding the state minimum.
Kissimmee Flood Fill Elevation Standard
Some RestrictionsKissimmee Land Development Code § 14-9-1(G)(1)
Whenever a plan is submitted for an area that is a special flood hazard area but not in a floodway, the city may approve such subdivision, to an elevation sufficient to place the lowest floor, including basement, at a minimum of 18 inches above the base flood elevation of the 100-year frequency flood as determined by the city engineer or otherwise complies with [sub]section K.3.e.