Building Safety in Kissimmee, FL (2026)
4 verified building safety rules for Kissimmee, Florida, sourced directly from the municipal code and official government pages.
Verified from official government sources
Childcare Center Rules
Kissimmee's Land Development Code sets site-design rules for child care facilities: dedicated pick-up/drop-off areas kept out of the public right-of-way, separated parking, and clear ingress/egress lanes. A facility sited within 300 feet of a residential zoning district needs conditional use approval, not just a permit.
Kissimmee Child Care Facility Site Standards
Some RestrictionsKissimmee Land Development Code § 14-6-37.A-H
Child care facilities shall meet the following standards: A.Child care facilities are permitted as shown in tables 4-1 and 4-2. However, where shown as P/C (permitted/conditional), facilities within 300 feet from a residential zoning district require conditional use approval.B.Child care facilities shall provide adequate short-term parking to accommodate pick-up and drop-off areas which are no...
Building Permits
Florida's state-adopted building code sets which projects need a permit; in Kissimmee, starting work before obtaining one draws an automatic $100 fine plus a doubled permit fee.
Kissimmee Fines Unpermitted Building Work
Some RestrictionsKissimmee City Code § 9-121
If any person commences any work for which a permit is required prior to obtaining said permit, a fine of $100.00 shall be imposed and shall be added to the required permit fee, which shall be doubled. Re-instatement of permits that had expired within six months of issuance shall be $60.00. (Code 1976, § 7-4; Code 1995, § 13-1-20(G); Ord. No. 609, § 1, 8-22-1972; Ord. No. 1271, § 1, 9-18-198...
Electrical Permits
Kissimmee requires a paid city permit for electrical work under the state building code, and every occupied building's wiring must meet the Florida Building Code and NFPA 70, the National Electrical Code.
Kissimmee Electrical Permit & NEC Rule
Some RestrictionsKissimmee City Code §§ 9-186, 9-294(5)
On all electrical work requiring a permit, as set forth by the state building code, fees shall be paid as required at the time of filing applications, in accordance with the following schedule: Minimum permit issuance $19.00, Service Up to 200 amps $25.00, Outlet and electrical fixture (each) $0.30. ... Every occupied building shall be provided with an electrical system in compliance with the r...
Plumbing Permits
Kissimmee charges a set fee schedule for every plumbing permit, starting at a $19 minimum issuance fee and running up per fixture, gas outlet, and irrigation head. Starting work before the permit is issued doubles the fee and adds a $100 penalty, and inspections must be scheduled by 3:30 p.m. the day before or they slip to the next business day.
Kissimmee Plumbing Permit Fee Schedule
Some RestrictionsKissimmee City Code § 9-166
On all plumbing work requiring a permit, as set forth by the state building code, fees shall be paid as required at the time of filing applications, in accordance with the following schedule: Minimum permit issuance $19.00; Backflow protective devices $25.00; Gas installation 1 to 4 outlets $25.00, Each additional outlet $12.00; Hose bibs $25.00; Landscape irrigation sprinkler system 0 to 5 hea...
Looking for Osceola County county-wide rules?
County ordinances apply to unincorporated areas and may supplement Kissimmee city rules.
Building Safety in Osceola County →