Skip to main content
CityRuleLookup

Building Safety in Monroe Township (Gloucester County), NJ (2026)

6 verified building safety rules for Monroe Township (Gloucester County), New Jersey, sourced directly from the municipal code and official government pages.

Verified from official government sources

Lead Paint

Monroe Township, Gloucester County, charges $196 for a permit for lead hazard abatement work and $40 for a lead abatement clearance certificate under § 104-18 C(2)(i). The state surcharge is not collected on lead abatement permits, and rental units built before 1978 carry a separate $50 Lead Hazard Control Assistance Fund fee.

Lead Hazard Abatement Permit Fees in Monroe Township, NJ

Light Restrictions

Monroe Township Code (Gloucester County) § 104-18

The fee for a permit for lead hazard abatement work shall be $196. The fee for a lead abatement clearance certificate shall be $40.

Carbon Monoxide Detectors

Section 162-11(D) of the Monroe Township Code in Gloucester County, New Jersey, requires each dwelling unit going through a certificate of occupancy inspection to have at least one smoke detector and one carbon monoxide detector, approved, listed and labeled, installed consistent with its listing.

Monroe Township Carbon Monoxide Detector Requirement

Some Restrictions

Monroe Township Code (Gloucester County) § 162-11(D)

§ 162-11. Inspections of dwelling units and certificates of occupancy. ... D. Smoke detectors and carbon monoxide detectors required. In addition to the requirements for a certificate of occupancy hereinabove set forth, it shall also be required that each such dwelling unit have installed therein a minimum of one smoke detector and one carbon monoxide detector approved, listed and labeled "smok...

Building Permits

In Monroe Township, Gloucester County, construction or alteration of a building or structure cannot start until the Monroe Township Construction Code Enforcing Agency issues a construction permit. The agency must grant or deny an application within 20 business days, and a permit expires if no work starts within one year or work stops for six months.

Construction Permits in Monroe Township, Gloucester County NJ

Some Restrictions

Monroe Township Code (Gloucester County) § 104-21

Every application for a construction permit shall be granted, in whole or in part, or denied within 20 business days. If the application is denied in whole or in part, the Monroe Township Construction Code Enforcing Agency shall set forth the reasons therefor in writing. ... Except as otherwise provided in this article, the construction or alteration of a building or structure shall not be comm...

Electrical Permits

Monroe Township, Gloucester County, prices electrical permits under § 104-18 of its Township Code by the receptacle, fixture, motor and service panel. One to 50 receptacles or fixtures cost $75, each added 25 cost $15, and the minimum fee for any basic construction permit is $75.

Electrical Permit Fees in Monroe Township, Gloucester County

Some Restrictions

Monroe Township Code (Gloucester County) § 104-18

The minimum fee for a basic construction permit covering any or all of building, plumbing, electrical or fire protection work shall be $75. ... Electrical fixtures and devices. ... For from one to 50 receptacles or fixtures, the fee shall be in the amount of $75; and for each 25 receptacles or fixtures in addition to this, the fee shall be in the amount of $15. For the purpose of computing this...

Plumbing Permits

Monroe Township, Gloucester County, charges plumbing permit fees under § 104-18 C(1)(b): $15 per fixture, piece of equipment or appliance connected to the plumbing system, $91 per listed special device such as a backflow preventer or sewer pump, and $40 for a lawn sprinkler.

Plumbing Permit Fees in Monroe Township, Gloucester County

Some Restrictions

Monroe Township Code (Gloucester County) § 104-18

Plumbing fixtures and equipment. The fees shall be as follows: ... The fee shall be $15 per fixture, piece of equipment or appliance connected to the plumbing system, and for each appliance connected to gas piping or an oil piping system except as listed in Subsection C(1)(b)[2] below. ... The fee shall be $91 per special device for the following: grease traps, oil separators, water-cooled air-...

Building Inspections

In Monroe Township, Gloucester County, the Construction Code Enforcing Agency periodically inspects all permitted construction, and starting work means consenting to inspection of the entire premises until a certificate of occupancy issues. Inspections run between 9:00 am. and 5:00 p.m. unless there is an immediate danger, and a written stop-construction order can halt noncompliant work.

Building Inspections and Stop-Construction Orders in Monroe Township

Some Restrictions

Monroe Township Code (Gloucester County) § 104-22

The Monroe Township Construction Code Enforcing Agency shall periodically inspect all construction undertaken pursuant to the construction permit issued by it to ensure that the construction or alteration is performed in accordance with law and with the conditions of the construction permit. ... The owner of any premises upon which a building or structure is being constructed shall be deemed to...

Looking for Gloucester County county-wide rules?

County ordinances apply to unincorporated areas and may supplement Monroe Township (Gloucester County) city rules.

Building Safety in Gloucester County →