Environmental Rules in West Bloomfield, MI (2026)

5 verified environmental rules for West Bloomfield, Michigan, sourced directly from the municipal code and official government pages.

Verified from official government sources

Stormwater Management

West Bloomfield Township requires an approved stormwater management plan or engineered site grading plan before most new development or redevelopment can break ground. Plans must show zero net increase in runoff, and violations of the article draw a $1,000 civil fine, doubling to $2,000 for repeat offenses.

West Bloomfield Stormwater Management Plan Rules

Significant Restrictions

West Bloomfield Township Code §§ 24-205, 24-213, 24-227

Except for those activities expressly exempted by section 24-206, every new development (as defined in this article), or redevelopment in the Township of West Bloomfield shall have either a stormwater management plan or an engineered site grading plan ... No development or preparation for development on a site shall occur unless and until an application has been submitted and approved ... (7)Th...

Erosion Control

West Bloomfield Township's Sec. 8-376 makes it unlawful to conduct an earth change without a Soil Erosion and Sedimentation Control (SESC) permit from the development services department, required whenever the disturbance covers an acre or more or lies within 500 feet of state waters or wetlands.

West Bloomfield Soil Erosion Control Permit Rule

Significant Restrictions

West Bloomfield Township Code §§ 8-376, 8-383

(a)It shall be unlawful to permit, authorize or conduct an earth change without first obtaining a SESC permit with approved SESC plans from the development services department unless a permit and/or plans are not required under the provisions of this article, Part 91, or the Rules.(b)SESC permit requirements. Unless otherwise exempt by this article, Part 91, or the Rules, a landowner or designa...

Flood Zones

West Bloomfield Township bans new assembly buildings, non-code-compliant residential dwellings, and mobile homes in flood hazard areas under Sec. 12-72, and any obstruction placed in a floodway without a township permit is automatically a public nuisance under Sec. 12-71.

West Bloomfield Floodplain Development Rules

Significant Restrictions

West Bloomfield Township Code §§ 12-71, 12-72, 12-73

Any obstruction in any floodway is hereby declared to be a public nuisance unless a permit has been obtained for such obstruction from the township. ... It shall be unlawful to locate within a flood hazard area the following improvements or structures:(1)Any structure either public or private for the purpose of assembly.(2)Any new residential dwelling unless it complies with all applicable prov...

Boat Dock Permits

West Bloomfield Township lets a single-family riparian owner install a seasonal dock on an inland lake without a permit, but only if it goes in on or after April 1, comes out by October 31, and stays under one hundred feet from the ordinary high water mark; anything longer, permanent, or off-season needs a township use permit under Chapter 12.

West Bloomfield Boat Dock Permit Rules

Some Restrictions

West Bloomfield Township Code §§ 12-91, 12-92

(5)Construct or enlarge any operation, use, development, or structure on a watercourse or wetland except for noncommercial seasonal docks and other recreational facilities conforming to subsections 12-92(4) through (6). In addition to a use permit, an EGLE permit is also required for marinas, association docks, and commercial docks. ... (9)Construct, enlarge, or operate a dock in excess of one ...

Flood Elevation Requirements

West Bloomfield Township requires every stormwater detention basin built for new development to hold a one-foot freeboard above the design 100-year high water elevation. The township engineer must approve the overflow route, spillway surface and side-slope design before the basin is accepted.

West Bloomfield Detention Basin Freeboard Rule

Some Restrictions

West Bloomfield Township Code § 24-185

(a)All new developments shall be required to provide stormwater holding facilities to retain runoff and limit peak discharge to that of the existing hydrology. ... (e)All detention basins must have a one-foot freeboard above the design one hundred-year high water elevation. All basins must have an overflow provision draining to a location which can reasonably accept such overflow without damage...

Looking for Oakland County county-wide rules?

County ordinances apply to unincorporated areas and may supplement West Bloomfield city rules.

Environmental Rules in Oakland County →