Skip to main content
CityRuleLookup

Miramar, FL Environmental Rules: Boat Dock Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required
Building department approval before construction
Max protrusion
15 feet onto public property
Maintenance duty
Constant state of repair
Removal notice
15 days to remove if noncompliant
Governing chapter
City Code Ch. 22, Art. VI

Summary

Miramar requires building department approval before anyone builds a dock, caps how far a dock can extend onto public waterway property at 15 feet, and orders owners to keep docks in constant repair or remove them within 15 days of notice. The rule is codified at City Code Sec. 22-172.

Prior to the construction of a dock within the city, the owner shall obtain approval of the proposed construction from the city building department. The amount of a dock protruding onto public property shall be at the discretion of the building department and based upon waterway width. In no case shall protrusion onto public property exceed fifteen (15) feet. Docks shall be kept in a constant state of repair by the owner. Any dock not properly constructed or maintained must be removed at the direction of the building department within fifteen (15) days of receipt of notice.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 104 | Land Development Code: Supplement 46).

Full Breakdown

Sec. ' This dock rule sits in the same chapter 22 article as Miramar's canal and lakefront maintenance easement rules: Sec. 22-168 requires a 20-foot maintenance easement on canal or lake front lots, and Sec. 22-171 exempts sloped, bulkhead-free banks from separate bulkhead design review, but expressly states that 'bulkheads will not be required for the construction of docks,' confirming docks are governed by their own permit standard in Sec. 22-172 rather than the bulkhead-design sections that precede it.

Violations & Fines

A dock that is improperly constructed or falls out of repair must be removed within 15 days of the building department's written notice; failure to remove it exposes the owner to code enforcement action under the city's general nuisance and unsafe-structure remedies, including cost recovery and liens if the city has to act.

Frequently Asked Questions

Do I need a permit to build a dock in Miramar?
Yes. Sec. 22-172 requires the property owner to get city building department approval before any dock construction begins, and the department sets the allowable protrusion based on waterway width.
How far can a Miramar dock extend onto public waterway property?
No more than 15 feet under Sec. 22-172, regardless of waterway width; the building department decides the exact allowable distance within that ceiling.
What happens if my dock falls into disrepair?
The building department can order it removed, and Sec. 22-172 gives the owner just 15 days from receipt of that notice to take it down.

Sources & Official References

Other rules in Miramar

All Miramar rules

Florida rules heatmap·Compare Miramar to another location·View the Florida environmental rules overview

Get notified when Boat Dock Permits in Miramar, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Boat Dock Permits in Nearby Cities

How other cities in Broward County handle boat dock permits.

Pembroke Pines, FL
Some Restrictions
Hollywood, FL
Significant Restrictions
Fort Lauderdale, FL
Significant Restrictions
Pompano Beach, FL
Significant Restrictions