Skip to main content
CityRuleLookup

North Hempstead, NY Environmental Rules: Boat Dock Permits (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required for
docks, piers, moorings (Ch. 42)
Residential permits reviewed by
Building Department (§42-7A)
Commercial/multifamily review
Waterfront Advisory Commission + Town Board hearing
Fees
set by Town Board resolution (§42-15)
First-offense fine
$250-$1,000 (§42-19A)
Damage threshold for new permit
$5,000 (§42-8)

Summary

North Hempstead requires a Town Clerk-filed structure permit before building, enlarging or altering any dock, pier or mooring in its waterways. Residential applications go through the Building Department; commercial, multifamily and yacht club projects need a Waterfront Advisory Commission review and a Town Board public hearing.

For applications for a structure permit for residential use, the Town Clerk shall transfer a copy of all the application materials to the Building Department, which shall examine said application for compliance with this chapter and the laws, ordinances, regulations or specifications governing such structures. The Building Department shall approve the application if the application and the proposed structure comply with all requirements of this chapter.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4892187; v82 updated 2026-04-21; through 04-21-2026).

Full Breakdown

Section 42-6 requires a verified application with a site plan, an aerial view showing a 500-foot radius, the structure's length, width and cost, and proof of the applicant's ownership of the abutting upland, plus proof that the Army Corps of Engineers and the state Department of Environmental Conservation have issued their own permits or letters of nonjurisdiction (§ 42-6D). Nonresidential applicants must carry liability insurance naming the Town as an additional insured (§ 42-6C). Under § 42-7A, the Town Clerk forwards a residential application to the Building Department, which approves it if the plans comply with Chapter 42 and can attach reasonable conditions; a disapproval lets the applicant seek relief from the Town Board (§ 42-11).

Commercial, multifamily residential, marine commercial, nonmarine commercial, yacht club and perimeter reconfiguration permits instead go to the Commissioner of Building Safety, the Commissioner of Planning, and the Department of Public Safety/Bay Constable for review, then to the Town's Waterfront Advisory Commission, and finally to a Town Board public hearing with notice mailed to owners within 500 feet (§ 42-7B). Permits transfer with the property but the new owner must file a change of name within six months or the permit automatically terminates (§ 42-6F). Fees are set by Town Board resolution (§ 42-15).

If a permitted structure is damaged, repairs under $5,000 that match the existing permit need no new filing (§ 42-8B), but damage of $5,000 or more must be reported in writing to the Commissioner of Buildings and the Director of Harbor and Marine Enforcement before repair (§ 42-8C).

Violations & Fines

Section 42-19A punishes any Chapter 42 violation with a fine of $250 to $1,000 for a first offense, $500 to $2,500 for a second offense within one year, and $1,000 to $5,000 for a third offense within three years, with each day of continued violation counted as a separate offense. The Commissioner of Buildings can also suspend a permit for up to 30 days for noncompliance, and the Town Board can revoke it and order removal after a hearing (§ 42-8A).

Frequently Asked Questions

Do I need a permit to build a dock in North Hempstead?
Yes. Chapter 42 requires a structure permit before constructing, erecting, enlarging, installing, altering or improving any dock, pier or similar waterway structure, filed with the Town Clerk under § 42-6 with a site plan, adjacent owner list and required fee.
Who reviews a residential dock permit application?
Under § 42-7A, the Town Clerk sends the application to the Building Department, which examines it for compliance with Chapter 42 and approves it if the application and proposed structure meet all requirements, with authority to attach reasonable conditions.
Does a commercial or multifamily dock need a public hearing?
Yes. Section 42-7B routes commercial, multifamily and yacht club structure permits and any perimeter reconfiguration permit through the Waterfront Advisory Commission and a Town Board public hearing, with notice mailed to owners within 500 feet.
What if my dock is damaged?
Section 42-8B allows repair without a new permit if the damage is under $5,000 and matches the existing permit's specifications. Damage of $5,000 or more must be reported to the Commissioner of Buildings and Director of Harbor and Marine Enforcement before repairs begin.

Sources & Official References

Other rules in North Hempstead

All North Hempstead rules

New York rules heatmap·Compare North Hempstead to another location·View the New York environmental rules overview

Get notified when Boat Dock Permits in North Hempstead, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.