Key Facts

Governing sections
City Code Secs. 5-4-1.1 to 5-4-18
Small-disturbance exemption
Under 2,500 sq ft, grade under 10%
Plan validity
Expires 180 days after approval
First civil penalty
$500, then $1,000 per repeat
Penalty cap
$3,000 total per 10-day period
Appeal window
30 days to city manager

Summary

Alexandria requires an approved erosion and sediment control plan before anyone builds, alters a building's footprint, or clears, grades, excavates, fills or strips topsoil on land in the city. The Department of Transportation and Environmental Services administers the program under City Code Title 5, Chapter 4.

Except as provided in section 5-4-5 of this code, it shall be unlawful for any persons to construct or erect any building or structure on any land within the city unless there is in force an approved erosion and sedimentation control plan issued under the provisions of this chapter.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 156 | Zoning: Supplement 103).

Full Breakdown

City Code Sec. 1 makes it unlawful to construct or erect any building or structure on land in the city unless an approved erosion and sedimentation control plan is in force, and Sec. 5-4-2 extends the same requirement to enlarging an existing building's footprint. Sec. 5-4-3 separately bars clearing, grading, excavating, filling, removing topsoil, or changing the contour of land, and bars removing or destroying trees, shrubs, grass, weeds, vegetation or ground cover, unless an approved plan is in force. Sec. 5-4-4 goes further and requires that once a plan is approved, all construction, grading and vegetation removal proceed strictly in accordance with it.

Under Sec. 5-4-6, no building permit or land-disturbance permit may issue until the plan is submitted, approved, and the applicant certifies in writing the plan will be followed; the person carrying out the plan must also identify an individual holding a Virginia Department of Environmental Quality certificate of competence under Sec. 15:52 who will be responsible for the land-disturbing activity. Sec. 5-4-5 exempts small disturbances, generally those under 2,500 square feet with no drainage ditch or swale draining more than 2,500 square feet and no grade over 10 percent, along with routine lawn care, dead or diseased vegetation removal, utility connections, and a handful of other narrow categories.

An approved plan expires 180 days after approval under Sec. 5-4-15 unless the work is completed or an updated plan is approved. The director may waive the plan requirement under Sec. 5-4-16 only on written application and only if waiving it will not increase erosion or sedimentation. A final decision to disapprove a plan can be appealed in writing to the city manager within 30 days under Sec. 5-4-18.

Violations & Fines

Violations trigger both an administrative stop-work process and civil penalties. Under Sec. 5-4-14, the director first issues a verbal notice to the responsible contractor and follows with written notice to comply by certified mail; if no action is taken within 48 hours, the director sends a letter of intent to draw on the performance bond or cash escrow. Under Sec. 5-4-14.1, a civil penalty of $500 applies to a person's first violation and $1,000 to each subsequent violation of the same provision, with each day a separate violation, though a series of violations from the same facts cannot be penalized more than once per ten-day period and civil penalties cannot exceed $3,000 total. The city may also seek an injunction restraining the violation in circuit court under Sec. 5-4-14.1(b).

Frequently Asked Questions

Do I need an erosion control plan to add a small addition in Alexandria?
Only if the disturbed area is 2,500 square feet or more, or the site has a drainage ditch or swale draining more than 2,500 square feet, or the existing or proposed grade exceeds 10 percent. Smaller, flatter disturbances fall under the Sec. 5-4-5 exception and need no plan.
How long is an approved erosion and sediment control plan good for?
Under Sec. 5-4-15, an approved plan becomes null and void 180 days after approval unless the work is finished within that window or an updated plan is submitted and approved before it lapses.
What happens if I disturb land in Alexandria without an approved plan?
The director can issue a stop-work order under Sec. 5-4-11, and you face a civil penalty of $500 for a first violation and $1,000 for each later violation of the same section under Sec. 5-4-14.1, plus possible injunctive action in circuit court.

Sources & Official References

Other rules in Alexandria

All Alexandria rules

Compare Alexandria to another location·View the Virginia environmental rules overview

Get notified when Erosion Control in Alexandria, VA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.