Alhambra, CA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
AMC § 16.34.070, construction storm water
SWPPP trigger
Required for GCASP-covered projects
Small-project rule
City-reviewed runoff control program
Concrete washout
Only in city-designated wash area
Penalty class
Misdemeanor, § 1.12.010 general penalty

Summary

Before Alhambra issues a grading or building permit, applicants must prove they have filed a Notice of Intent and prepared a Storm Water Pollution Prevention Plan for larger projects, or otherwise run a city-reviewed erosion and sediment control program that limits grading in the wet season and covers exposed slopes.

(A) Each person applying to the city for a grading or building permit for projects for which compliance with regulations governing State Construction Activity Storm Water Permits ("GCASPs") is required, must submit satisfactory proof to the city ... that a Storm Water Pollution Prevention Plan has been prepared, before the city shall issue any grading or building permit on the construction project. ... (C) Each person applying for a grading or building permit for any project for which compliance with regulations governing State Construction Activity Storm Water Permits is not required, shall ... implement a grading and construction activity runoff control program adequate to accomplish all of the following: (1) Retain on-site the sediments generated on or brought to the project site, using treatment control or structural BMPs; ... (4) Control erosion from slopes and channels through use of effective BMPs, such as limitation of grading during the wet season, inspection of graded areas during rain events; planting and maintenance of vegetation on slopes, if any, and covering any slopes susceptible to erosion.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-25: Supplement contains: Local legislation current through Ord. 4851, passed 10-27-25).

Full Breakdown

070 sets the city's construction-site erosion and sediment control requirements. 070(A) requires the applicant to submit satisfactory proof that a Notice of Intent (NOI) has been filed and that a Storm Water Pollution Prevention Plan (SWPPP) has been prepared before the city will issue any grading or building permit; a copy of the NOI and SWPPP must stay on-site during grading and construction for inspection. 070(C) still requires the applicant to submit, and implement, a grading and construction activity runoff control program that retains on-site sediment using treatment control or structural best management practices, keeps construction materials, wastes, spills and residues from reaching streets or drainage facilities, contains wash water from equipment and vehicle washing, and controls erosion from slopes and channels through measures such as limiting grading during the wet season, inspecting graded areas during rain events, planting and maintaining vegetation on slopes, and covering slopes susceptible to erosion.

070(D) through (F) add related site controls: recovering pavement saw-cutting waste before it reaches a drain, managing street and road maintenance materials to keep them out of the MS4, and washing concrete trucks and equipment only in a city-designated area.

Violations & Fines

Conducting construction activity that requires a GCASP without complying with it, per Section 16.34.070(B), and any breach of the runoff control program under Section 16.34.070(C), are chapter violations enforced as misdemeanors under Section 16.34.080. Because the chapter carries no standalone fine schedule, punishment follows the general penalty at Section 1.12.010: a City Council-set fine, up to six months' imprisonment, or both, with each day of continuing noncompliance a separate offense.

Frequently Asked Questions

Do I need a Storm Water Pollution Prevention Plan for my Alhambra project?
If your project must comply with the state's General Construction Activity Storm Water Permit, Section 16.34.070(A) requires you to prove an NOI was filed and a SWPPP was prepared before the city issues a grading or building permit, and to keep both on-site for inspection.
What erosion controls does Alhambra require on smaller construction sites?
Section 16.34.070(C)(4) requires controlling erosion from slopes and channels through effective BMPs such as limiting grading during the wet season, inspecting graded areas during rain events, planting and maintaining vegetation on slopes, and covering slopes prone to erosion.
Where can I wash out a concrete truck in Alhambra?
Section 16.34.070(F) allows washing a concrete truck, pump or tools only in an area the city has designated for that purpose; letting rinseate reach a drain, ditch, street or catch basin is prohibited.

Sources & Official References

Other rules in Alhambra

All Alhambra rules

California rules heatmap·Compare Alhambra to another location·View the California environmental rules overview

Get notified when Erosion Control in Alhambra, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Los Angeles County handle erosion control.

Carson, CA
Some Restrictions
West Covina, CA
Some Restrictions
El Monte, CA
Some Restrictions
Inglewood, CA
Some Restrictions
Santa Monica, CA
Some Restrictions
South Gate, CA
Some Restrictions
Santa Clarita, CA
Some Restrictions
Palmdale, CA
Some Restrictions