Canton, OH Environmental Rules: Erosion Control (2026)
Key Facts
- Governing chapter
- Codified Ordinances Chapter 961
- Enforcing agency
- City Engineering Dept./Public Service Director
- Standard used
- City Storm Water Mgmt Manual BMPs
- Administrative penalty
- Up to $1,000 per violation
- Criminal penalty
- Minor misdemeanor, $150 fine, first offense
- Inspection authority
- Warrantless entry on active construction sites
Summary
In the City of Canton, Ohio, Chapter 961 of the Codified Ordinances folds erosion and sediment control into the city's storm water program. The chapter directs the City Engineering Department to control erosion potential, non-point source pollution and stream channel erosion, and requires construction sites to implement approved Best Management Practices under the City of Canton Storm Water Management Manual.
(d) To control the rate, volume and quality of storm water runoff originating from development and redevelopment sites so that surface water, groundwater, and properties are protected and flooding and erosion potential are not increased. ... (f) To control non-point source pollution and stream channel erosion. ... "Construction Site Storm Water Quality Management" means the implementation of proper BMP's on construction sites to control erosion and sediment and reduce pollutants in storm water runoff from the respective land.
Full Breakdown
Canton's Storm Water Management chapter, Codified Ordinances Chapter 961, was adopted by Ordinance 200-2009 to meet National Pollutant Discharge Elimination System Phase II requirements and folds erosion control into the city's broader storm water program rather than a stand-alone erosion ordinance. Section 961.01 states the chapter's purpose is to control the rate, volume and quality of runoff so that flooding and erosion potential are not increased, and to control non-point source pollution and stream channel erosion. Section 961.02(e) defines "Construction Site Storm Water Quality Management" as the implementation of proper Best Management Practices on construction sites to control erosion and sediment and reduce pollutants in runoff.
Those BMPs are drawn from the City of Canton Storm Water Management Manual adopted under Section 961.05, which the City Engineering Department maintains and may update based on engineering, science and federal or state regulatory changes. The Director of Public Service or designee administers the program, and representatives of the City Engineering, Health and Fire Departments may inspect a construction site under Section 961.11 to confirm compliance, entering permitted sites without prior consent. A property owner who fails to correct erosion or sediment problems after a written Notice of Violation under Section 961.13 can face a Stop Work Order, an administrative hearing, and civil proceedings brought by the Law Director, in addition to the administrative and criminal penalties set out in Section 961.99.
Violations & Fines
Section 961.99 sets administrative penalties of up to $500 for failing to meet a Notice of Violation's compliance standards, up to $500 for a negligent illicit discharge and up to $1,000 for a deliberate illicit discharge or illegal connection to the storm sewer system. Separately, any person violating the chapter is guilty of a minor misdemeanor on a first offense, fined up to $150.00, rising to a fourth-degree misdemeanor for a repeat violation within one year, with each day of continued violation charged as a separate offense.
Frequently Asked Questions
Does Canton require erosion control on construction sites?
Who enforces Canton's erosion and storm water rules?
What happens if a builder ignores an erosion control violation in Canton?
Sources & Official References
Other rules in Canton
Compare Canton to another location·View the Ohio environmental rules overview