Chino Hills, CA Environmental Rules: Erosion Control (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Prohibited
any condition causing accelerated erosion
Enforcing official
Building Official
Plan required before
non-exempt grading or land clearing
Runoff design storm
10-year storm event
Winter operations window
Oct. 15 to Apr. 15
Stop-work power
during inclement weather
Appeal path
Planning Commission, § 16.54.140

Summary

Chino Hills bans any site condition that causes or is likely to cause accelerated erosion. Municipal Code Section 16.54.030 lets the Building Official cite a property, order corrective measures on a deadline, and require an approved soil erosion and sediment control plan or permit before grading, land clearing, or construction resumes, with power to halt work during storms if erosion controls fail.

A.No person shall cause or allow the continued existence of a condition on any site that is causing or is likely to cause accelerated erosion as determined by the Building Official.B.Upon citation by the Building Official, the responsible person, shall take all appropriate measures to control erosion on the site specified in the notification within the period of time determined by the Building Official.C.The Building Official may require that a property owner whose property has been cited in accordance with subsection B of this section file and obtain approval of a soil erosion and sediment control plan and/or permit in accordance with Section 16.54.050.D.The Building Official may direct that any particular operation, process or construction be stopped during periods of inclement weather if he or she determines that erosion problems are not adequately being controlled.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 61).

Full Breakdown

020 applies that mandate to all existing and potential human-induced erosion citywide. 030, is a flat prohibition: no person may cause or allow a condition that is causing, or is likely to cause, accelerated erosion, as the Building Official determines. 050 as a condition of continuing work. 060, which are sized to handle a ten-year storm, on-site retention or detention, nonerodible discharge points, filter strips or catch basins, and a buffer zone along any lake or watercourse. 070 caps land clearing to what is needed for building, access, and fire protection, and requires temporary or permanent revegetation.

080's winter operations rule is the sharpest deadline in the chapter: contiguous clearing over one acre or grading over 1,000 cubic yards needs Building Official authorization to proceed between October 15 and April 15, erosion control devices must be installed by October 15 on ongoing projects, and every winter-period permit must carry a stamped notice warning of the added requirements.

Violations & Fines

Under Section 16.54.030(D), the Building Official can order any grading, land clearing, or construction operation stopped outright during inclement weather if erosion controls are not holding. A property owner who ignores a citation and required corrective measures is also exposed to the citywide Chapter 1.36 general penalty, a misdemeanor punishable by up to a $1,000 fine or six months in county jail, or an infraction fine escalating from $100 to $500 for repeat violations within a year. Decisions may be appealed to the Planning Commission under Section 16.54.140.

Frequently Asked Questions

What triggers an erosion control violation in Chino Hills?
Any site condition that is causing, or is likely to cause, accelerated erosion violates Section 16.54.030, as determined by the Building Official, whether or not construction is underway; the Building Official can cite the responsible party and set a deadline for corrective measures.
Do I need a permit to grade or clear land in Chino Hills?
In most cases yes. Section 16.54.050 requires an approved soil erosion and sediment control plan or permit before grading or land clearing that is not specifically exempted, and the Building Official can also require one after citing an existing erosion problem under Section 16.54.030.
Are there extra rules for grading in winter?
Yes. Section 16.54.080 requires Building Official authorization for contiguous land clearing over one acre or grading over 1,000 cubic yards between October 15 and April 15, and erosion control devices must already be installed by October 15 for projects still under construction.
Can the City stop my construction project for erosion problems?
Yes. Section 16.54.030(D) lets the Building Official order any operation, process, or construction stopped during inclement weather if erosion problems on the site are not being adequately controlled, regardless of any permit already issued.

Sources & Official References

Other rules in Chino Hills

All Chino Hills rules

California rules heatmap·Compare Chino Hills to another location·View the California environmental rules overview

Get notified when Erosion Control in Chino Hills, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in San Bernardino County handle erosion control.

Fontana, CA
Some Restrictions
Hesperia, CA
Some Restrictions
Rancho Cucamonga, CA
Some Restrictions
Victorville, CA
Some Restrictions
Rialto, CA
Some Restrictions
Chino, CA
Some Restrictions
San Bernardino, CA
Significant Restrictions