Chino Hills, CA Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Freeboard requirement
- 1 ft above base flood elevation
- Applies to
- New construction and substantial improvements
- Certification
- Registered civil engineer or surveyor
- Zone AO
- Separate depth-based standard, § 15.12.170(C)(2)
- Nonresidential option
- Dry floodproofing, § 15.12.170(C)(3)
- Manufactured homes
- Separate standard, § 15.12.200
Summary
New construction and substantial improvements inside a Chino Hills special flood hazard area must raise the lowest floor, including any basement, at least one foot above the base flood elevation, and a registered engineer or surveyor must certify the finished elevation under § 15.12.170(C)(1).
New construction and substantial improvement of any structure shall have the lowest floor, including basement, elevated to at least one (1) foot above the base flood elevation. Non-residential structures may meet the standards in subsection C.3 below. Upon completion of the structure the elevation of the lowest floor, including basement, shall be certified by a registered civil engineer or surveyor or verified by the community Building Official that elevation requirements have been met. Such certification and verification shall be provided to the Floodplain Administrator.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 61).
Full Breakdown
170 of the Floodplain Damage Prevention and Floodplain Management chapter sets the construction standards that apply to every new building and substantial improvement inside a mapped special flood hazard area in Chino Hills. 1 requires the lowest floor, including any basement, to be elevated to at least one foot above the base flood elevation, the 100-year flood level shown on the FEMA Flood Insurance Rate Map; that one-foot freeboard sits on top of FEMA's federal minimum. Once the structure is complete, a registered civil engineer or surveyor must certify the as-built lowest-floor elevation, or the city's Building Official must verify it, and that certification goes to the Floodplain Administrator, the City Engineer, before the project can close out.
3 instead of elevating. The same section requires flood-resistant construction materials, utility equipment located to keep water out during flooding, and, for any enclosed area below the lowest floor used only for parking or storage, engineered flood openings sized to at least one square inch of net open area per square foot of enclosed space so hydrostatic pressure can equalize automatically. 200.
Violations & Fines
Failing to elevate a new structure or substantial improvement to the required one-foot freeboard, or occupying it without the engineer's or surveyor's elevation certification, is a violation of Chapter 15.12 and constitutes a misdemeanor under § 15.12.080. The Floodplain Administrator may withhold final approval until the certified elevation documentation is on file.
Frequently Asked Questions
How high above the base flood elevation must I build in Chino Hills?
Who certifies that my house meets the flood elevation requirement?
Can a commercial building floodproof instead of elevating?
Sources & Official References
Other rules in Chino Hills
California rules heatmap·Compare Chino Hills to another location·View the California environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Flood Elevation Requirements in Nearby Cities
How other cities in San Bernardino County handle flood elevation requirements.