Skip to main content
CityRuleLookup

Garland, TX Environmental Rules: Erosion Control (2026)

Light Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit Required
Grading permit for land disturbance
Drainage Standard
Detain to pre-development rates
Design Storm
100-year event for major drainage
Review Authority
Garland Engineering Department
Creek Corridors
Special attention near Duck/Rowlett Creek

Summary

Garland requires grading permits for land disturbance activities under the Development Code. All development must manage drainage to prevent adverse impacts on adjacent properties. Post-development stormwater runoff must be detained to match or reduce pre-development flow rates. The city's terrain varies from flat to gently rolling, requiring engineered drainage solutions for developments near creek corridors.

Sec. 232.003. SUBDIVISION REQUIREMENTS. By an order adopted and entered in the minutes of the commissioners court, and after a notice is published in a newspaper of general circulation in the county, the commissioners court may:(1) require a right-of-way on a street or road that functions as a main artery in a subdivision, of a width of not less than 50 feet or more than 100 feet;(2) require a right-of-way on any other street or road in a subdivision of not less than 40 feet or more than 70 feet;(3) require that the shoulder-to-shoulder width on collectors or main arteries within the right-of-way be not less than 32 feet or more than 56 feet, and that the shoulder-to-shoulder width on any other street or road be not less than 25 feet or more than 35 feet;(4) adopt

Source: Garland Development Code — StormwaterView official code

Full Breakdown

Garland regulates grading and drainage through building and engineering codes. Site grading must direct drainage away from structures and not adversely affect neighboring properties. Drainage swales, French drains, and catch basins may be required. Retaining walls over 4 feet need engineering and separate permits. Compaction testing required for structural fill. Final grade must match approved plans. Property owners responsible for maintaining drainage facilities on their land.

Frequently Asked Questions

When do I need a grading permit in Garland?
A grading permit is required for significant land disturbance including site preparation, lot regrading, and drainage modifications. Contact Garland Engineering for thresholds.
What are Garland's drainage requirements?
Development must detain post-development runoff to pre-development rates. Detention facilities are designed for the 100-year storm event. Engineering plans must be submitted with development applications.

Sources & Official References

Other rules in Garland

All Garland rules

Texas rules heatmap·Compare Garland to another location·View the Texas environmental rules overview

Get notified when Erosion Control in Garland, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Dallas County handle erosion control.

Cedar Hill, TX
Light Restrictions
DeSoto, TX
Light Restrictions
Carrollton, TX
Some Restrictions
Richardson, TX
Some Restrictions
Grand Prairie, TX
Some Restrictions
Irving, TX
Some Restrictions
Dallas, TX
Some Restrictions