Irving, TX Environmental Rules: Erosion Control (2026)
Key Facts
- Permit required
- Before any earthwork/grading
- Permit fee
- $35, nonrefundable
- Stormwater plan trigger
- 5+ acres disturbed
- Topsoil cover
- Minimum 6 inches
- Cleanup notice period
- 10 days before city acts
- Lien trigger
- Unpaid after 30 days
Summary
Irving requires an earthwork permit before grading, filling, or excavating, and Section 41-62.6 bars placing fill without controlling erosion on cut and fill slopes with planting, check dams, cribbing, or riprap. The permit costs $35 and sites over five acres need an EPA stormwater permit and engineer-prepared plan.
No person shall place fill on a site without preparing and maintaining the faces of cut and fill slopes to control against erosion with effective planting, check dams, cribbing, riprap, or other devices and methods as necessary as soon as is practicable and before calling for an inspection for final approval. It is an affirmative defense to this section that the cut slopes are not subject to erosion due to the erosion-resistant character of the materials.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4988517; v32 updated 2026-07-30).
Full Breakdown
1, no person may perform or permit earthwork within the city without first securing an earthwork permit; it is an affirmative defense that the work is on a lot under one acre with an existing single-family home, or is done under an active building permit that already complies with grading, erosion control, and stormwater discharge rules. 2 must submit, for any work disturbing five or more acres, a copy of an approved EPA stormwater permit accompanied by a stormwater prevention plan prepared by a registered engineer, plus two sets of scaled plans showing proposed erosion control construction, site contours, drainage devices, and any protected tree under the zoning ordinance's tree preservation section.
3). 5 requires fill sites to be leveled and covered with a minimum six inches of topsoil that will support vigorous plant growth immediately after filling, or covered at intervals not exceeding thirty days for filling operations that run longer than that; the director may approve an alternative erosion-resistant cover instead. 6 is the core erosion-control mandate during construction: no one may place fill without preparing and maintaining the faces of cut and fill slopes against erosion using effective planting, check dams, cribbing, riprap, or other devices, done as soon as practicable and before requesting the final inspection; it is an affirmative defense that the cut slopes are erosion-resistant by their material character.
4 requires the permittee to notify the department when grading is ready for final inspection, and the director will not approve the work unless all drainage facilities, protective devices, and erosion control measures are complete per the approved grading plan.
Violations & Fines
Section 41-62.7 makes the property owner responsible for cleanup, including leveling, ground cover, erosion control, and removing trash or unsuitable fill deposited on streets, alleys, utility facilities, rights-of-way, and easements. If the owner does not fix a violation within ten days of written notice, the city may remove the deposited material itself and bill the owner; if the bill goes unpaid after thirty days, the city may place a lien on the property.
Frequently Asked Questions
Do I need a permit to grade or fill my Irving lot?
What erosion control measures satisfy Irving's code?
What happens if erosion debris washes onto the street or a neighbor's lot?
Is a stormwater prevention plan required for my project?
Sources & Official References
Other rules in Irving
Texas rules heatmap·Compare Irving to another location·View the Texas environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Erosion Control in Nearby Cities
How other cities in Dallas County handle erosion control.