Greenwood, IN Environmental Rules: Erosion Control (2026)
Key Facts
- Trigger threshold
- 10,000 sq ft or more of land disturbance
- Full-permit threshold
- 1 acre+ needs stormwater management permit
- Permit fee
- $100 erosion and sediment control permit
- Enforcing agency
- Stormwater Department / Community Development Services
- First-offense fine (residential)
- $150, up to $750 by third offense
Summary
In the City of Greenwood, Indiana, any project that clears, grades, excavates, or otherwise disturbs land must follow Sec. 9-157's Stormwater Pollution Prevention Plan (SWPPP) rules. An individual lot disturbing 10,000 square feet or more, or any part of a larger common plan of development that will ultimately disturb that much land, needs an erosion and sediment control or stormwater management permit before Community Development Services issues a building permit.
a. Applicability. The City shall require a Stormwater Pollution Prevention Plan (SWPPP) that includes erosion and sediment control measures and materials handling procedures, to be submitted as part of a project's construction plans and specifications. Projects located within the district that include clearing, grading, excavation or other land disturbing activities resulting in the disturbance of land are subject to this Section as outlined in subsections (c)- (e) below. ... c. Individual Lots with Disturbances Greater than One Acre. For an individual lot where land disturbance is expected to be one (1) acre or more, the individual lot owner must complete his/her own notice of intent letter, apply for a stormwater management permit from the Board of Stormwater Management. ... d. Individual Lots with Disturbances Greater than 10,000 Square Feet and Less than One Acre. For an individual lot where land disturbance is 10,000 square feet or more but less than one (1) acre, an erosion and sediment control permit application is required prior to receiving a building permit under Greenwood Building Code, found at Greenwood Municipal Code Section 7-1 et seq. ...
Full Breakdown
Sec. 9-157 requires a SWPPP with erosion and sediment control measures and materials-handling procedures as part of a project's construction plans. Individual lots expected to disturb one acre or more must file their own notice of intent and apply to the Board of Stormwater Management for a stormwater management permit. Lots disturbing 10,000 square feet or more but less than one acre need an erosion and sediment control permit, which costs $100 under the City's Sec. 4-66 fee schedule, before a building permit issues under the Greenwood Building Code at Sec.
7-1 et seq. Lots disturbing less than 10,000 square feet inside a larger permitted project fall under that project's approved SWPPP instead of needing their own permit. The ordinance exempts agricultural tillage and planting, silvicultural activity, oil and gas operations, and regulated-drain ditch maintenance under I.C. 36-9-27. Once work starts, a trained individual acceptable to the Stormwater Department must inspect the site by the end of the next business day after every measurable storm, or at least weekly if no storm occurs, until the site is stabilized and a notice of termination is issued. The Stormwater Department and Community Development Services may inspect at any time and charge an inspection fee under Sec. 9-161(l) and (m).
Violations & Fines
Violating Sec. 9-157 is enforced under Sec. 9-163's civil penalty schedule. An individual residential lot faces $150 for a first offense, $350 for a second, and $750 for a third; a commercial lot or multi-parcel development faces $500, $1,000, and $2,500 for the same tiers, with each day of continued violation counted as a separate offense plus cleanup costs and attorneys' fees.
Frequently Asked Questions
When does Greenwood require an erosion and sediment control permit?
What if my lot disturbs a full acre or more?
What are the penalties for skipping the permit in Greenwood?
Sources & Official References
Other rules in Greenwood
Compare Greenwood to another location·View the Indiana environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.