Greenwood, IN Environmental Rules: Stormwater Management (2026)
Key Facts
- Governing sections
- UDO Sec. 9-150 through Sec. 9-163
- Detention design storm
- Post-development runoff can't exceed pre-development
- Minimum sewer design
- 24-hour, 10-year return storm
- Floodplain restriction
- No detention basin allowed in 100-year floodplain
- Commercial first-offense fine
- $500, rising to $2,500 by third offense
Summary
In the City of Greenwood, Indiana, the Department of Stormwater Management regulates drainage design and stormwater discharge under UDO Article 4, Sec. 9-150 through Sec. 9-163. Sec. 9-150 sets the Article's objectives: reducing the hazard from excessive stormwater runoff, regulating pollutant contributions from construction and redevelopment, and prohibiting illicit discharges into the storm drain system.
c. The City has further determined it is necessary, for the protection of public health, safety, and welfare of the citizens of the City to regulate Stormwater and non-Stormwater Discharges to the storm Drainage system and to protect, conserve and promote the orderly Development of land and Water Resources within the City. ... b. Policy on Stormwater Quantity Management. It is recognized that most streams and drainage channels serving the stormwater district do not have sufficient capacity to receive and convey stormwater runoff resulting from continued urbanization. Accordingly, the storage and controlled release of excess stormwater runoff as well as compensation for loss of floodplain storage shall be required for all developments and redevelopments located within the stormwater district. ... 2. The required volume of storage provided in detention basins ... shall be sufficient to control excess runoff from the 10-year or 100-year storm as set forth in the Stormwater Technical Manual. The post-development run-off discharge from the project site must not exceed the pre-development discharge based on the 2-year, 10-year, and 100-year peak storm events.
Full Breakdown
Sec. 9-150 explains that the City created the Department of Stormwater Management to protect public health, safety, and welfare and to keep Greenwood compliant with its NPDES Stormwater Discharge permit under the federal Clean Water Act, 33 U.S.C. §§ 1251-1387. If a project sits in a Johnson County Regulated Drain Watershed, the applicant must also satisfy the Johnson County Surveyor's Office before the City issues any permit. Sec. 9-156 then sets the technical standard: because streams and drainage channels serving the district lack capacity for continued urbanization, new business, institutional, commercial, industrial, and residential subdivision developments must store and control the release of excess runoff, with detention basins sized so post-development discharge does not exceed pre-development discharge for the 2-year, 10-year, and 100-year storm events.
Storm sewers, inlets, and swales must handle a 24-hour, 10-year return storm at minimum, while ditches must carry the 100-year event within their banks or a designated easement, and no detention facility may sit within the 100-year floodplain. The Board of Public Works and Safety can waive controlled-runoff requirements only for minor subdivisions and parcelization after investigation. All calculations must follow the City's Stormwater Technical Manual, and the Stormwater Department may require more restrictive design storms for individual developments.
Violations & Fines
Any violation of the Article is a public nuisance under Chapter 6, Article 6, enforced under Sec. 9-163: fines run on the schedule tied to each section, with commercial or multi-parcel developments facing $500 for a first offense, $1,000 for a second, and $2,500 for a third under the Sec. 9-156 quantity-management table, and each day of continued violation counted separately.
Frequently Asked Questions
Who regulates stormwater in Greenwood?
What detention standard applies to new development?
Can Greenwood waive stormwater detention requirements?
Sources & Official References
Other rules in Greenwood
Compare Greenwood to another location·View the Indiana environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.