Hall County, GA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing sections
§ 10.1.2 exemptions, § 10.1.3 BMP/buffer standards
Stream buffer
25 feet along banks of state waters
Trout stream buffer
25-50 feet, no variance on primary streams
Turbidity trigger
25 NTU warm-water, 10 NTU trout streams
Permit issuer
Hall County Development Services
Maximum penalty
Up to $2,500 per day, § 10.1.7

Summary

Hall County requires a land-disturbing permit and state-approved best management practices for construction sites under Sec. 10.1.3, and Sec. 10.1.3.C.20 sets a 25-foot vegetated buffer along the banks of state waters that grading crews cannot disturb without a Director-approved variance. Development Services and the Engineering Department enforce the standard on every subdivision and building site.

These county ordinances apply to unincorporated areas of Hall County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

20.There is established a 25-foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except:a.As provided in paragraphs 20 and 21 of this subsection.b.Where the Director determines to allow a variance that is at least as protective of natural resources and the environment.c.Where otherwise allowed by the Director pursuant to O.C.G.A. § 12-2-8.d.Where a drainage structure or roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated in the project plans and specifications, and are implemented.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 80).

Full Breakdown

Sec. 1, Erosion, Sedimentation, and Sedimentation Control, applies to all land-disturbing activity in unincorporated Hall County, with narrow exemptions in Sec. 2 for surface mining, granite quarrying, home gardens, and single-family construction that disturbs less than one acre outside a larger common plan of development. Sec. B requires best management practices meeting the state's Manual for Erosion and Sediment Control in Georgia for every other land-disturbing activity, and Sec. 20 establishes a 25-foot buffer along the banks of all state waters, measured from the point normal stream flow has wrested away vegetation; that buffer can be reduced only where the Director finds an equally protective alternative, or where a necessary drainage structure crosses it with erosion controls in place.

Sec. 2 backs the BMP requirement with a numeric trigger: a stormwater discharge from a disturbed site is a separate permit violation for each day it raises the turbidity of receiving waters by more than 25 nephelometric turbidity units in warm-water fisheries, or more than 10 units in trout streams. Single-family homes get added protection near trout streams: Sec. 4 sets a 50-foot no-disturbance buffer along primary trout waters that cannot be varied down, 50 feet (reducible to 25 feet by the Director) along secondary trout waters, and 25 feet along first-order trout waters with no variance allowed.

Before any grading starts, the developer must hold a land-disturbing permit issued through Hall County Development Services; disturbing land without one doubles the permit fee and can trigger business-license revocation.

Violations & Fines

Sec. 10.1.7 sets a graduated response: the Director issues a written warning for a first or second violation with five days to correct it, then a stop-work order halting land-disturbing activity if the violation isn't fixed, or an immediate stop-work order for a third violation or an imminent threat to public health or state waters. Sec. 10.1.7 also authorizes fines up to $2,500 per day, with each day of continued noncompliance a separate violation.

Frequently Asked Questions

Does Hall County require a buffer along streams during construction?
Yes. Sec. 10.1.3.C.20 establishes a 25-foot buffer along the banks of all state waters, measured from where normal stream flow has washed away vegetation, and grading equipment generally cannot disturb it. The Director may allow a variance only where an alternative is at least as protective, or where a drainage structure must cross the buffer with erosion controls in place.
Is single-family home construction exempt from Hall County's erosion rules?
Only partly. Sec. 10.1.2.A.4 exempts single-family construction disturbing less than one acre outside a larger development plan from needing a full land-disturbing permit, but the home still must meet the minimum BMP standards of Sec. 10.1.3 and, near a trout stream, a buffer of 25 to 50 feet depending on the stream classification.
What triggers a separate daily violation under the erosion ordinance?
Sec. 10.1.3.B.2 treats a stormwater discharge from a site with improperly maintained best management practices as a separate violation for each day it raises the turbidity of the receiving water by more than 25 nephelometric turbidity units in a warm-water fishery, or more than 10 units in a trout stream.
What happens after a first erosion-control violation?
The Director or local issuing authority sends a written warning under Sec. 10.1.7 and gives the violator five days to fix it. If it isn't corrected, or if the violation threatens public health or state waters, the county issues an immediate stop-work order halting land-disturbing activity until corrective action is completed.

Sources & Official References

Other rules in Hall County

All Hall County rules

Compare Hall County to another location·View the Georgia environmental rules overview

Get notified when Erosion Control in Hall County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.