Hall County, GA Environmental Rules: Flood Zones (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

FEMA flood zone rules in Hall County, GA, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.

Key Facts

Governing section
§ 10.2.3.A, permit requirement
Permit issuer
Hall County Development Services
Site plan required
Elevations, floodway, floodplain boundaries shown
Variance authority
Hall County Engineer (§ 10.2.6)
Appeal window
30 days to Planning Commission
Enforcement
Notice of violation, injunctive relief (§ 10.2.7)

Summary

No owner or developer may start any development activity in a Hall County area of special flood hazard or future-conditions flood hazard without first meeting the county's flood protection permit requirements. Sec. 10.2.3.A requires a Hall County Development Services permit application before any grading, filling, or construction begins on a mapped flood-hazard parcel.

These county ordinances apply to unincorporated areas of Hall County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

No owner or developer shall perform any development activities on a site where an area of special flood hazard or area of future-conditions flood hazard is located without first meeting the requirements of this section prior to commencing the proposed activity.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 80).

Full Breakdown

Sec. 1 of the Hall County Flood Protection ordinance applies to every area of special flood hazard and area of future-conditions flood hazard identified on the county's Flood Insurance Study, and Sec. A carries the operative prohibition: no owner or developer may perform development activities on such a site without first meeting the section's requirements. The permit application, filed with Hall County Development Services on the county's form, must include a scaled site plan showing existing and proposed elevations, the footprint of every proposed structure with spot ground elevations at the corners, proposed water, sewer, and drainage locations, a grading plan, the base flood and future-conditions flood elevations, the boundaries of both floodplains, and, where one exists, the location of the floodway, all certified by a licensed engineer or surveyor.

The application must also include building and foundation design detail, including the elevation in relation to mean sea level of the lowest floor of every proposed structure. No permit may be approved for a project that does not meet the section's requirements, restrictions, and criteria. Sec. 4 defines the floodplain and floodway boundaries the permit review works from, using FEMA's studied 'A' zones for the base flood elevation and directing the Hall County Engineer, or a licensed engineer using a FEMA-approved method, to set the future-conditions flood elevation for any stream draining 100 acres or more when FEMA data isn't available.

A property owner who disagrees with a floodplain determination or a permit condition can request a variance from the Hall County Engineer under Sec. 6, with a further appeal to the Planning Commission within 30 days of the Engineer's decision.

Violations & Fines

Sec. 10.2.7 treats development in a flood hazard area without the Sec. 10.2.3 permit as a code violation: the county serves a written notice of violation directly on the property owner or the person running the site, and a continuing violation is deemed a public nuisance the county can abate through injunctive or other equitable relief, on top of any other penalty available under the Code.

Frequently Asked Questions

Do I need a permit to develop in a Hall County flood zone?
Yes. Sec. 10.2.3.A bars any owner or developer from starting development activity on a site within a mapped area of special flood hazard or future-conditions flood hazard until Hall County Development Services approves a permit application meeting the section's site plan and design requirements.
What has to be on a Hall County floodplain permit application?
Sec. 10.2.3 requires a scaled site plan showing the base flood and future-conditions flood elevations, the floodplain and floodway boundaries, spot ground elevations at every proposed structure's corners, and proposed drainage and utility locations, all certified by a licensed engineer or surveyor before the county will approve the permit.
Who sets the flood elevation data Hall County uses for permitting?
For streams with at least 100 acres of drainage area, Sec. 10.2.4.A directs the Hall County Engineer to provide the future-conditions flood elevation; if that data isn't available, a licensed professional engineer must determine it using a method approved by both FEMA and the Hall County Engineer.
Can a property get a variance from the floodplain permit rules?
Yes. Sec. 10.2.6 lets an owner request a variance from the Hall County Engineer, who must give affected parties notice and a chance to be heard, and a decision can be appealed to the Hall County Planning Commission within 30 days.

Sources & Official References

Other rules in Hall County

All Hall County rules

Compare Hall County to another location·View the Georgia environmental rules overview

Get notified when Flood Zones in Hall County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.