Highland, CA Environmental Rules: Erosion Control (2026)
Key Facts
- Enforcing officials
- Building official and city engineer
- Design storm for runoff controls
- 10-year storm
- Rainy season protection window
- October 15th to April 15th
- Rainy season grading limit
- Major grading of more than 100 cubic yards needs authorization
- Advance notice of work
- At least 24 hours to the building official
- Watercourse buffer
- Confines visible siltation within 25 percent of the buffer zone
Summary
In the City of Highland, California, land clearing and grading need an approved soil erosion and sediment control plan before building or grading permits issue. Runoff controls must handle a 10-year storm, and protection must be in place between October 15th and April 15th. The building official enforces and inspects.
C. General Provisions. ... 1. No person shall cause or allow the continued existence of a condition on any site that is causing or is likely to cause accelerated erosion as determined by the building official. ... 2. A soil erosion and sediment control plan ... shall be submitted and approved in accordance with the provisions of this section prior to the issuance of building permits, soil erosion and sediment control permits, grading permits or any other permit where, in the opinion of the building official, erosion can reasonably be expected to occur. ... ... F. Runoff Control. Runoff from activities subject to a development permit shall be properly controlled to prevent erosion. ... The following measures shall be used for runoff control and shall be adequate to control runoff from a 10-year storm: ... ... 2. The protection required by this section shall be installed prior to calling for final approval of the grading operation and at all times between October 15th and April 15th. Such protection shall be maintained until permanent protection is established.
Full Breakdown
Highland Municipal Code § 16.64.070 controls human-induced accelerated erosion in the City of Highland, in areas within or adjacent to mountains and hillsides. No person can cause or allow a condition on any site that is causing or is likely to cause accelerated erosion, as determined by the building official. After notice from the city engineer or building official, the owner must take appropriate measures within a reasonable period set by the building official, and can be required to obtain approval of a soil erosion and sediment control plan or permit. Either official can order an operation stopped during inclement weather if erosion is not adequately controlled.
No land clearing or grading, other than exempted activity, can occur unless it complies with an approved soil erosion and sediment control plan or permit. The plan must be submitted and approved before building permits, soil erosion and sediment control permits, grading permits or any other permit issue where the building official expects erosion. The building official sets the application requirements, including licensing or certification for those preparing submittals. Applications with no land disturbance, such as change of use permits with no expansion of land-disturbing activities and construction within an existing structure, need no plan.
Runoff from development activities must be controlled with measures adequate for a 10-year storm. Where soils have a permeability rate of more than two inches per hour, runoff above predevelopment levels is retained on site. Where soils drain at two inches per hour or less, runoff is detained or dispersed so the rate does not exceed predevelopment levels. No earth, organic or construction material can be placed where it can be carried into a stream, lake, marsh, slough, lagoon, or body of water, and work near watercourses needs a buffer zone that confines visible siltation within 25 percent of the buffer zone nearest the work.
Land clearing is kept to a minimum. Disturbed surfaces get temporary planting or mulching and permanent planting, and topsoil on slopes less than 20 percent is stockpiled and reapplied. Protection must be installed before calling for final grading approval and at all times between October 15th and April 15th. Vegetation removal in that window cannot precede grading or construction by more than 15 days. During the rainy season, the building official authorizes contiguous clearing of more than one acre in a one-year period, and major grading of more than 100 cubic yards, only when the project complies. Erosion control measures must be in place at the end of each day's work. Permittees notify the building official at least 24 hours before starting authorized work, and filing a development permit application grants the City permission to enter the permit area.
Violations & Fines
Chapter 1.24 makes any violation of the Highland Municipal Code, or of a permit condition, a misdemeanor unless the city attorney or district attorney prosecutes it as an infraction. Each day a violation continues is a separate offense, and administrative citations under Chapter 2.56 are available. The building official can stop construction during inclement weather, and owners cited for erosion can be required to obtain a plan or permit.
Frequently Asked Questions
Do I need an erosion control plan to grade my lot in Highland?
What are Highland's rainy season rules?
Who enforces erosion control in the City of Highland?
What activities are exempt from the erosion chapter?
Sources & Official References
Other rules in Highland
California rules heatmap·Compare Highland to another location·View the California environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Erosion Control in Nearby Cities
How other cities in San Bernardino County handle erosion control.