Key Facts

Governing rule
Grading Appendix J, section J105.5 Erosion Control
Timing
Installed as soon as practicable, before final approval
Slope top protection
Interceptor drains or berms where upslope area drains toward slope
Other devices
Check dams, cribbing, rip-rap where necessary
Exception approval
Building official, for erosion-resistant cut slopes
SWPPP trigger
Construction projects one acre or greater

Summary

In the Town of Prescott Valley, Arizona, cut and fill slopes must be prepared and maintained to control erosion, and the protection must be installed before final approval is called. Check dams, cribbing, rip-rap or other devices are required where necessary, and interceptor drains or berms go along the top of slopes.

J105.4.5 Interceptor Drains or Berms. Interceptor drains or berms shall be installed along the top of all cut and/or fill slopes where the upslope tributary area drains toward the cut or fill. Interceptor drains or berms shall be graded to provide suitable drainage and shall be designed to prevent erosion and provide durability. J105.5 Erosion Control. The faces of cut and fill slopes shall be prepared and maintained to control erosion, generally through effective planting. This erosion protection shall be installed as soon as practicable and prior to calling for final approval. Exception: Where cut slopes are not subject to erosion due to the erosion- resistant character of the materials, such protection may be omitted upon approval of the building official. J105.5.1 Other Devices. Where necessary, check dams, cribbing, rip-rap or other devices or methods shall be employed to control erosion.

Full Breakdown

The Town of Prescott Valley amends Appendix J, Grading, of the International Building Code in its entirety at Town Code § 7-02-350.J. Section J105 governs grading and drainage work, and J105.5 is the erosion control rule. The faces of cut and fill slopes must be prepared and maintained to control erosion, generally through effective planting, and that erosion protection must be installed as soon as practicable and prior to calling for final approval. The only exception is for cut slopes not subject to erosion because of the erosion-resistant character of the materials, and protection can be omitted only upon approval of the building official.

Section J105.5.1 adds that where necessary, check dams, cribbing, rip-rap or other devices or methods shall be employed. Section J105.4.5 requires interceptor drains or berms along the top of all cut and fill slopes where the upslope tributary area drains toward the cut or fill. They must be graded to provide suitable drainage and designed to prevent erosion and provide durability. Under J105.4.3, erosion of ground at a discharge point is prevented by noncorrosive downdrains or other devices, and building pads need a drainage gradient of 2 percent toward approved drainage facilities unless the building official waives it.

Slope limits support the same goal. Cut surfaces under J105.1 are not steeper than 2 horizontal to 1 vertical unless the permittee furnishes a soils engineering or engineering geology report, and fill slopes under J105.2.1 are not built on natural slopes steeper than 2:1.

A separate layer sits in the stormwater chapter. Section 12a-01-090(E) requires site-specific stormwater pollution prevention plans for all construction projects one acre or greater, and § 12a-01-090(F) directs the Town Engineer to publish general stormwater pollution guidelines that address pollution caused by soil erosion. Discharges of soil, rock, trash, garbage and other waste to the storm sewer system are prohibited by § 12a-01-070(A)(2).

Violations & Fines

Grading violations are enforced by the building official through the permit and inspection process, since final approval depends on the erosion protection being in place. Under § 12a-02-010 the Town Engineer can issue a written notice requiring corrective action or a stop-work order on clearing, grading, excavating or filling, and violating that notice is a civil offense enforced under Town Code Article 1-08.

Frequently Asked Questions

When must erosion protection on a graded slope be in place?
Section J105.5 requires the protection to be installed as soon as practicable and prior to calling for final approval. A slope without it is not ready for final inspection by the building official.
Can erosion protection be skipped on a cut slope?
Only where the cut slope is not subject to erosion because of the erosion-resistant character of the materials, and only upon approval of the building official. Without that approval the slope face must be prepared and maintained to control erosion.
What devices does the code name for controlling erosion?
Section J105.5.1 names check dams, cribbing and rip-rap, plus other devices or methods where necessary. Section J105.4.5 separately requires interceptor drains or berms along the top of cut and fill slopes that receive upslope drainage.
Do I need a stormwater plan for a construction site?
Section 12a-01-090(E) requires a site-specific stormwater pollution prevention plan for construction projects one acre or greater. Smaller projects either prepare a site plan or file a notice of intent approved by the Town Engineer.

Sources & Official References

Other rules in Prescott Valley

All Prescott Valley rules

Compare Prescott Valley to another location·View the Arizona environmental rules overview

Get notified when Erosion Control in Prescott Valley, AZ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Yavapai County handle erosion control.

Sedona, AZ
Some Restrictions