Sauk County, WI Environmental Rules: Erosion Control (2026)
Key Facts
- Permit trigger
- 4,000 sq ft disturbed or 400 cubic yards moved
- Soil loss cap
- Under 5 tons per acre annually
- Exemptions
- Farming, small home sites, shoreland-permitted work
- Stabilization standard
- 70% perennial vegetative cover required
- Enforcing agency
- Land Resources and Environment Zoning Administrator
- Penalty
- $200 to $1,000 per offense, per day
Summary
Any land disturbance of 4,000 square feet or 400 cubic yards in unincorporated Sauk County needs a Land Resources and Environment Department land use permit under County Code § 51.09, and the erosion control plan approved under § 51.12 must hold soil loss on exposed ground to less than five tons per acre a year until the site is stabilized.
The requirements and provisions of this subchapter will apply to any of the following land disturbing activities and shall require the issuance of a land use permit unless otherwise exempted in section 51.10:(1)Grading, removal of protective ground cover or vegetation, excavation, land filling or other land disturbing activity which affects an area of 4,000 square feet or more. ... The proposed design and implementation of all erosion control measures shall be designed to the following standards:(1)All erosion control practices shall be implemented and utilized as directed in the technical standards set forth by the Wisconsin Department of Natural Resources and the Wisconsin Construction Site Erosion Control Field Guide, or its successors.(2)Prevent gully and bank erosion.(3)Limit soil loss on exposed areas from sheet or rill erosion to an annual cumulative soil loss rate of less than five tons per acre annually. ... will be subject to a fine of not less than $200.00 nor more than $1,000.00 (exclusive of court costs) per offense. ... Each section of the ordinance that is in violation and each day that the violation exists will constitute a separate offense.
Full Breakdown
Sec. 51.09 pulls in a land use permit requirement for grading, excavation or fill that disturbs 4,000 square feet or more, for excavating or filling 400 cubic yards or more, for road, bridge or highway work of the same size, for utility pipe runs of 300 feet or more, for subdivision and condominium plats under Chapter 22, and for any smaller disturbance the Department flags as high risk, including land with 12 percent slopes or greater. Sec. 51.10 exempts row-crop farming, sod and tree nurseries, one- and two-family homes disturbing under an acre, work within 300 feet of navigable water already covered by the Chapter 8 shoreland rules, and state or federally exempted highway projects.
Sec. 51.11 requires the permit applicant to submit a signed erosion control plan showing lot lines, existing natural features, drainage patterns, stockpile locations and a revegetation plan before the Zoning Administrator issues the permit. Sec. 51.12 sets the performance floor: practices must follow DNR and Wisconsin Construction Site Erosion Control Field Guide standards, prevent gully and bank erosion, and cap soil loss on exposed areas at under five tons per acre annually from sheet or rill erosion. Sec. 51.13 requires BMPs installed before land disturbance begins and maintained until final stabilization, defined as 70 percent perennial vegetative cover, with temporary stabilization required whenever work pauses for more than 14 days. Violators face the same $200.00 to $1,000.00 per-offense, per-day fine set out in Sec. 51.23 for the whole chapter.
Violations & Fines
Disturbing 4,000 square feet or 400 cubic yards of soil without the Sec. 51.09 land use permit, or failing to install and maintain BMPs to the five-tons-per-acre soil loss standard in Sec. 51.12, is a violation of Chapter 51 that draws a stop work order under Sec. 51.19(2)(f). Sec. 51.23 fines violators not less than $200.00 nor more than $1,000.00 per offense, with each day of noncompliance counted as a separate offense on top of any permit revocation.
Frequently Asked Questions
When does a Sauk County project need an erosion control permit?
What is Sauk County's soil loss limit during construction?
Is farmland exempt from Sauk County's erosion control ordinance?
How long must erosion controls stay in place on a Sauk County site?
Sources & Official References
Other rules in Sauk County
Compare Sauk County to another location·View the Wisconsin environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.