Southampton Village, NY Environmental Rules: Erosion Control (2026)
Key Facts
- Sediment removal
- When trap or pond design capacity is reduced by 50%
- Inspection frequency
- Every seven days for Condition A, B or C projects
- Inspection records
- Kept in a site logbook
- Disturbance limit
- Not more than five acres at one time (§ 93-5B(1)(d))
- Inspection notice
- At least 48 hours before each listed stage
- Fine
- Up to $2,000 or 15 days; each day is a separate offense
Summary
In the Village of Southampton, construction sites must keep erosion and sediment controls running under an approved SWPPP. Sediment is removed from traps and ponds when design capacity drops by 50%, and larger projects need a qualified inspector to check the controls every seven days, with reports kept in a site logbook.
A. Maintenance and inspection during construction. (1) The applicant or developer of the land development activity or his or her representative shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the applicant or developer to achieve compliance with the conditions of this chapter. Sediment shall be removed from sediment traps or sediment ponds whenever their design capacity has been reduced by 50%. (2) For land development activities as defined in § 93-2 of this chapter and meeting Condition A, B or C in § 93-5B(2), the applicant shall have a qualified inspector (as defined in the SPDES General Permit for Stormwater Discharges from Construction Activity, Permit No. GP-0-10-001) conduct site inspections and document the effectiveness of all erosion and sediment control practices every seven days. Inspection reports shall be maintained in a site logbook.
Full Breakdown
Section 93-7A of the Southampton Village Code puts the day-to-day duty on the applicant or developer, who must at all times properly operate and maintain every treatment and control facility used to comply with Chapter 93. Sediment comes out of sediment traps and ponds when their design capacity has been reduced by 50%. For projects meeting Condition A, B or C in § 93-5B(2), a qualified inspector as defined in the SPDES General Permit, Permit No. GP-0-10-001, must inspect and document the effectiveness of all erosion and sediment control practices every seven days, and the reports go in a site logbook.
The controls start on paper. Every SWPPP under § 93-5B(1) must include a site map, a description of the soils, a construction phasing plan, temporary and permanent structural and vegetative measures for soil stabilization, runoff control and sediment control for each stage, dimensions and installation details for each practice, an implementation schedule and a maintenance schedule. The phasing plan follows the New York Standards and Specifications for Erosion and Sediment Control: not more than five acres can be disturbed at any one time unless pursuant to an approved SWPPP. Each contractor and subcontractor involved in soil disturbance must sign a certification statement before starting (§ 93-5D), and a copy of the SWPPP stays at the site from the start of construction to final stabilization (§ 93-5E).
Inspections are called in by the applicant. Under § 93-8A the Stormwater Management Officer can require notice at least 48 hours before the start of construction, installation of sediment and erosion control measures, completion of site clearing, rough grading, final grading, close of the construction season, final landscaping, and successful establishment of landscaping in public areas. If violations are found, the applicant and developer get written notice, and no further work can proceed except site stabilization until the violations are corrected and the work receives approval. Section 93-6C bars any increase in turbidity that results in substantial visible contrast to natural conditions in surface waters. The Village can also require a performance bond, cash escrow or irrevocable letter of credit under § 93-9A, held for not less than one year.
Violations & Fines
The Stormwater Management Officer can issue a notice of violation and a stop-work order under § 93-10, and a person who violates Chapter 93 is subject to the Chapter 1, Article II penalties: a fine not exceeding $2,000 or imprisonment for up to 15 days, with each day a separate offense. A violator can be required to restore land to its undisturbed condition, and the cost of any corrective action by the Village becomes a lien on the property.
Frequently Asked Questions
How often must erosion controls be inspected on a Southampton Village construction site?
When does sediment have to be cleaned out of a trap or pond?
When do I have to call the Stormwater Management Officer for an inspection?
Can work continue after the officer finds a violation?
Sources & Official References
Other rules in Southampton Village
New York rules heatmap·Compare Southampton Village to another location·View the New York environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Erosion Control in Nearby Cities
How other cities in Suffolk County handle erosion control.