FEMA flood zone rules in Southampton Village, NY, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.

Key Facts

Local administrator
The Building Inspector, 23 Main Street, Southampton
FEMA community number
365343
FIRM panels effective
September 25, 2009, with a 2025 map revision
Review cost deposit
No more than $500
Substantial improvement
Cost equals or exceeds 50% of market value
Penalty in § 62-9
Fine no more than $250 or 15 days, or both

Summary

In the Village of Southampton, no development can start in an area of special flood hazard without a floodplain development permit from the Building Inspector, who is the designated local administrator. The permit carries an application fee set by Board of Trustees resolution plus a review deposit of no more than $500, and occupancy of a new or altered building requires a certificate of compliance.

A. Purpose. A floodplain development permit is hereby established for all construction and other development to be undertaken in areas of special flood hazard in this community for the purpose of protecting its citizens from increased flood hazards and insuring that new development is constructed in a manner that minimizes its exposure to flooding. It shall be unlawful to undertake any development in an area of special flood hazard, as shown on the Flood Insurance Rate Map enumerated in § 62-6, without a valid floodplain development permit. ... B. Fees. ... All applications for a floodplain development permit shall be accompanied by an application fee of the amount fixed from time to time by resolution of the Board of Trustees. In addition, the applicant shall be responsible for reimbursing the Village of Southampton for any additional costs necessary for review, inspection and approval of this project. The local administrator may require a deposit of no more than $500 to cover these additional costs.

Full Breakdown

Chapter 62, Flood Damage Prevention, applies to all areas of special flood hazard within the jurisdiction of the Village of Southampton, Suffolk County, New York (§ 62-5). Those areas are the ones shown on the FEMA Flood Insurance Rate Map panels listed in § 62-6 for Community Number 365343, effective September 25, 2009, together with the Suffolk County Flood Insurance Study of the same date and a Letter of Map Revision, Case No. 25-02-0080P, effective November 28, 2025. The study and maps are on file at the Office of the Building Inspector, 23 Main Street, Southampton, NY 11968.

The Building Inspector is the local administrator and grants or denies floodplain development permits (§ 62-11). Under § 62-12 it is unlawful to undertake any development in an area of special flood hazard without a valid permit. Applications go on forms furnished by the local administrator and include plans, in duplicate, drawn to scale showing the nature, location, dimensions and elevations of the area, existing or proposed structures, fill, storage of materials and drainage facilities. The fee is the amount the Board of Trustees fixes by resolution, and the applicant also reimburses the Village for additional review, inspection and approval costs, with a deposit of no more than $500 available to cover them.

The permit is not the end of the process. Section 62-14 requires a certified as-built elevation from a licensed land surveyor or professional engineer once the lowest floor is placed, periodic inspections during construction, and stop-work orders for development found ongoing without a permit or out of compliance with its conditions. Further work before the certification is submitted and approved proceeds at the permit holder's risk. No one can occupy a new or altered building in the zone until the local administrator issues a certificate of compliance.

The definitions in § 62-4 set the thresholds that pull a project into the full construction standards: a substantial improvement is work whose cost equals or exceeds 50% of the structure's market value before construction starts, and substantial damage means a restoration cost that equals or exceeds 50% of market value. A structure that fails the chapter and has no approved variance under Article VI is declared non-compliant and reported to FEMA (§ 62-9).

Violations & Fines

Under § 62-9, a person who violates Chapter 62 or fails to comply with any of its requirements is, upon conviction, fined no more than $250 or imprisoned for not more than 15 days, or both, and each day of noncompliance is a separate offense. Disregarding a stop-work order brings the same penalties (§ 62-14(F)). Chapter 1, § 1-21 states that the general penalty article supersedes any penalty section imposing a lesser fine, and § 1-17 sets that general ceiling at $2,000. The Village can also take other lawful action to prevent or remedy an infraction.

Frequently Asked Questions

Who issues floodplain development permits in the Village of Southampton?
The Building Inspector, whom § 62-11 appoints local administrator to administer the chapter by granting or denying floodplain development permits. Applications are made on forms furnished by the local administrator, and the flood maps and study are kept on file at the Office of the Building Inspector, 23 Main Street, Southampton, NY 11968.
What does a floodplain development permit cost in the Village of Southampton?
The application fee is the amount the Board of Trustees fixes from time to time by resolution, which § 62-12 does not state as a dollar figure. The applicant also reimburses the Village for additional review, inspection and approval costs, and the local administrator can require a deposit of no more than $500 to cover them.
Can I move into a new building in a flood zone as soon as it is finished?
No. Under § 62-14(G) it is unlawful to occupy or permit the use of a building in an area of special flood hazard that was created, changed, converted or altered until the local administrator issues a certificate of compliance. The certificate rests on the inspections and any certified elevations, floodproofing, anchoring or encroachment analyses required as permit conditions.
What happens to flood zone work started without a permit?
The local administrator must issue a stop-work order for any floodplain development found ongoing without a permit, and for any development that does not comply with the chapter or its permit conditions. Disregarding the order brings the § 62-9 penalties: a fine of no more than $250 or imprisonment of not more than 15 days, or both.

Sources & Official References

Other rules in Southampton Village

All Southampton Village rules

New York rules heatmap·Compare Southampton Village to another location·View the New York environmental rules overview

Get notified when Flood Zones in Southampton Village, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Zones in Nearby Cities

How other cities in Suffolk County handle flood zones.

Huntington, NY
Some Restrictions
Babylon, NY
Significant Restrictions
Islip, NY
Significant Restrictions