Titusville, FL Environmental Rules: Erosion Control (2026)
Key Facts
- Inspection scheduling
- Set by applicant with Administrator
- Inspection fee
- Due at stormwater construction permit issuance
- Stop-work authority
- Enforcement Official may halt noncompliant work
- Appeal window
- 14 days to request Code Enforcement Board hearing
- Maximum penalty
- $500 fine and/or 60 days jail per day
Summary
Titusville, Florida ties erosion and sediment control directly to its stormwater management permit: Sec. 30-213 requires the City to schedule erosion and sediment control inspections during construction, and Sec. 30-214 backs the requirement with a fine of up to $500, up to sixty days in jail, or both, for violations of the stormwater article.
Sec. 30-213. - Maintenance and inspections. (a)The installed system(s) required by this article shall be maintained by the owner. ... (d)Inspection fee(s) shall be paid at the time of issuance of a stormwater construction permit. The applicant shall schedule with the Administrator the following inspections:(1)Erosion and sediment control inspections: As necessary to ensure effective control of erosion and sedimentation. ... Sec. ... 30-214. - Enforcement and penalties. ... (d)Any person who violates or causes to be violated any provision of this article or permits any such violation or fails to comply with any of the requirements hereof shall be punished by a fine not to exceed five hundred dollars ($500.00) or by imprisonment in the County Jail for a period not to exceed sixty (60) days, or by both such fine and imprisonment.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 54 Update 1 | Land Development Regulations: Supplement 19 Update 1 | Technical Manuals: Supplement 10 Update 1).
Full Breakdown
Titusville, Florida (Brevard County) enforces erosion and sediment control through Land Development Regulations Chapter 30, Article III, Division 6, Subdivision 3, Hydraulic, Maintenance and Enforcement, rather than as a stand-alone erosion ordinance. Sec. 30-213(a)-(b) makes the owner responsible for maintaining any stormwater system installed under the article. Sec. 30-213(c) authorizes the City to inspect all erosion control measures at the time a development order is issued to ensure effective control, and Sec. 30-213(d) requires the applicant to pay an inspection fee at the time a stormwater construction permit is issued and to schedule erosion and sediment control inspections with the Administrator as necessary to ensure effective control of erosion and sedimentation, in addition to burial inspections of underground drainage structures and a final inspection before the work is signed off.
Enforcement runs through Sec. 30-214: if an Enforcement Official finds a project is not being built to the approved plan, or is proceeding without a permit, the Official can issue a written notice describing the noncompliance and the remedial action needed within three working days, and can follow with a stop-work order if the deadline is missed. A person named in either notice can request a hearing before the Code Enforcement Board within fourteen days of the action, and any stop-work order stays in effect until the Board issues a final decision.
Sec. 30-214(d) sets the penalty for violating the article at a fine of up to five hundred dollars, imprisonment in the county jail for up to sixty days, or both, with each day of a continuing violation treated as a separate offense, and allows the City to seek an injunction in addition to any fine. Sec. 30-215 carves out an emergency exemption for work needed to prevent material harm from fire, pest infestation, storms or hurricanes, provided the owner reports the emergency action to the Administrator within thirty days.
Violations & Fines
Working without a stormwater construction permit, skipping a scheduled erosion and sediment control inspection, or failing to follow the approved plan exposes a developer to a written noncompliance notice, a stop-work order, and referral to the Code Enforcement Board. A conviction for violating Division 6 of the article carries a fine of up to five hundred dollars, up to sixty days in the county jail, or both, with each day of continued violation a separate offense.
Frequently Asked Questions
Who inspects erosion control during construction in Titusville?
What happens if I build without a stormwater permit in Titusville?
Is there an exception for emergency erosion repairs in Titusville?
Sources & Official References
Other rules in Titusville
Florida rules heatmap·Compare Titusville to another location·View the Florida environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Erosion Control in Nearby Cities
How other cities in Brevard County handle erosion control.