Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Residential freeboard
3 feet above base flood elevation
Nonresidential freeboard
1 foot above base flood elevation
Lowest floor includes
the basement
Alternative
floodproofing for nonresidential structures
Governing section
§ 109-23(b), Flood Damage Prevention

Summary

Johns Creek requires new and substantially improved homes in the flood hazard area to elevate their lowest floor, including any basement, at least three feet above base flood elevation: one of Georgia's stricter local freeboard standards.

If all of the requirements of subsections 109-22(c) through (e) have been met, all new construction shall have the lowest floor, including basement, elevated no lower than three feet above the base flood elevation or one foot above the future-conditions flood elevation, whichever is higher.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 23 Update 1).

Full Breakdown

Johns Creek Code § 109-23(b) sets the city's freeboard standard for construction in the future-conditions floodplain. New construction and substantial improvement of a principal residential structure must have its lowest floor, including any basement, elevated no lower than three feet above the base flood elevation, or one foot above the future-conditions flood elevation, whichever is higher. Nonresidential buildings need only one foot of freeboard above base flood elevation, or may floodproof instead if a licensed engineer or architect certifies the design. A final elevation certificate is required before construction is considered complete.

Violations & Fines

Building below the required freeboard elevation without an approved variance violates § 109-23, triggering the same enforcement as any flood-article violation: stop-work orders, permit revocation, and civil fines up to $1,000 per day for each day the violation continues.

Frequently Asked Questions

How high above flood level must a new Johns Creek home be built?
At least three feet above the base flood elevation (or one foot above the future-conditions flood elevation, whichever is higher), measured to the lowest floor including any basement, per § 109-23(b)(1)a.
Can a nonresidential building floodproof instead of elevating?
Yes, § 109-23(b)(2)a lets new nonresidential construction be floodproofed watertight to one foot above base flood elevation instead of elevating, if certified by a licensed engineer or architect.

Sources & Official References

Other rules in Johns Creek

All Johns Creek rules

Compare Johns Creek to another location·View the Georgia environmental rules overview

Get notified when Flood Elevation Requirements in Johns Creek, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.