Oxnard, CA Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Freeboard required
2 feet above base flood elevation
Zone AO alternative
FIRM depth number, or 2-4 ft above grade
Administering official
City engineer as floodplain administrator
Certification required
Registered engineer or surveyor
Noncompliance
Misdemeanor under Sec. 18-10
Governing study
1979 Flood Insurance Study, as revised

Summary

In Oxnard's mapped Zone A and other special flood hazard zones, new construction and substantial improvements must set the lowest floor at least two feet above the base flood elevation. Building without a floodplain development permit is a misdemeanor under the city's flood damage prevention chapter.

(C) Elevation and flood proofing. ... The lowest floor, including basement, of a residential construction, new or substantial improvement, shall: ... (b) In a Zone A, be elevated at least two feet above the base flood elevation. Said base flood elevation shall be determined by one of the methods in section 18-21(B). (c) In all other zones, be elevated at least two feet above the base flood elevation. Upon the completion of the structure, the elevation of the lowest floor including basement shall be certified by a registered professional engineer or surveyor, and verified by a city building inspector to be properly elevated. Such certification and verification shall be filed with the floodplain administrator.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Contains Supplement current through 1-26-2026).

Full Breakdown

Oxnard Code of Ordinances Chapter 18 governs every area of special flood hazard shown on the city's Flood Insurance Rate Maps, first adopted from the March 1, 1979 Flood Insurance Study for the City of Oxnard and updated with each FEMA revision since. Section 18-35(C)(1) sets the elevation standard: in Zone A, the lowest floor of a new or substantially improved residential structure must be elevated at least two feet above the base flood elevation, with that elevation determined under the methods in Section 18-21(B); in all other special flood hazard zones the same two-foot freeboard above base flood elevation applies, and the finished elevation must be certified by a registered professional engineer or surveyor and verified by a city building inspector before the certification is filed with the floodplain administrator.

Zone AO parcels instead key off the FIRM-listed depth number, or two feet above the highest adjacent grade if none is listed. Nonresidential buildings may flood-proof instead of elevate under Section 18-35(C)(2), but the flood-proofed structure must be watertight, resist hydrostatic and hydrodynamic loads, and be certified by a registered engineer or architect. Enclosed areas below the lowest floor used only for parking, access or storage must have flood vents totaling at least one square inch of opening per square foot of enclosed area, with openings no higher than one foot above grade.

The city engineer serves as floodplain administrator under Section 18-20, reviewing every development permit application for compliance, confirming other state and federal permits are obtained, and determining the site is reasonably safe from flooding before a permit issues under Section 18-25.

Violations & Fines

Section 18-10 makes noncompliance a misdemeanor: no structure or land may be constructed, extended, converted or altered without full compliance with the chapter, and violating any condition or safeguard attached to a permit is a chargeable offense. Section 18-7 adds a presumption of violation: any structure lacking an elevation certificate or other required compliance documentation is presumed noncompliant until the owner produces it to the city.

Frequently Asked Questions

How high above base flood elevation must a new Oxnard home be built?
At least two feet above the base flood elevation in Zone A and in all other special flood hazard zones outside Zone AO, per Oxnard Code of Ordinances Section 18-35(C)(1). The elevation must be certified by a registered professional engineer or surveyor and verified by a city building inspector before the certification goes to the floodplain administrator.
Who enforces Oxnard's flood construction standards?
The city engineer, designated floodplain administrator under Section 18-20, reviews development permit applications, checks that state and federal permits are in hand, and confirms the site is reasonably safe from flooding before granting a permit under Section 18-25.
What happens if a structure lacks flood elevation documentation?
Section 18-7 presumes the structure is in violation until the owner supplies the elevation certificate or other required compliance evidence to the city. Building without permit compliance is a misdemeanor under Section 18-10.

Sources & Official References

Other rules in Oxnard

All Oxnard rules

California rules heatmap·Compare Oxnard to another location·View the California environmental rules overview

Get notified when Flood Elevation Requirements in Oxnard, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Elevation Requirements in Nearby Cities

How other cities in Ventura County handle flood elevation requirements.

Ventura, CA
Some Restrictions
Moorpark, CA
Some Restrictions
Simi Valley, CA
Some Restrictions
Camarillo, CA
Some Restrictions
Thousand Oaks, CA
Some Restrictions