Palm Desert, CA Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

A zone and other zones
Lowest floor at or above base flood elevation
AO zone
At or above the FIRM depth number, or two feet if none printed
State recommendation
Two feet above base flood elevation, printed as a recommendation
Certification
Registered professional engineer or surveyor, verified by building inspector
Manufactured home piers
Chassis piers no less than thirty-six inches above grade
LOMR deadline
Six months after data or project completion, whichever is first

Summary

In the City of Palm Desert, new residential construction and substantial improvements in a special flood hazard area need the lowest floor, including any basement, at or above the base flood elevation in an A zone and in all other zones. In an AO zone the floor must clear the FIRM depth number. The two-foot margin appears only as a State of California recommendation.

C. Elevation and Flood Proofing. ... 1. Residential construction, new or substantial improvement, shall have the lowest floor, including basement: a. In an AO zone, elevated above the highest adjacent grade to a height equal to or exceeding the depth number specified in feet on the FIRM, or elevated at least two feet above the highest adjacent grade if no depth number is specified. ... b. In an A zone, elevated to or above the base flood elevation; said base flood elevation shall be determined by one of the methods in Section 28.08.030(B) of this title. The state of California recommends the lowest floor be elevated at least two feet above the base flood elevation, as determined by the community. c. In all other zones, elevated to or above the base flood elevation. The state of California recommends the lowest floor be elevated at least two feet above the base flood elevation. Upon the completion of the structure, the elevation of the lowest floor including basement shall be certified by a registered professional engineer or surveyor, and verified by the community building inspector to be properly elevated.

Full Breakdown

The elevation rule sits in § 28.10.010(C)(1) of the Palm Desert Municipal Code and applies in all areas of special flood hazards. New residential construction and substantial improvements must have the lowest floor, including a basement, at a set height that depends on the zone on the FIRM. In an AO zone the lowest floor must be elevated above the highest adjacent grade to a height equal to or exceeding the depth number specified in feet on the FIRM, or at least two feet above the highest adjacent grade if no depth number is specified. In an A zone and in all other zones, the lowest floor must be elevated to or above the base flood elevation. The code prints the State of California's recommendation of two feet above the base flood elevation in those zones, but the city's own requirement is to or above the base flood elevation. When the structure is complete, a registered professional engineer or surveyor certifies the lowest floor elevation, the community building inspector verifies it, and the certification goes to the floodplain administrator.

Nonresidential buildings can be elevated the same way or flood proofed so the structure is watertight with walls substantially impermeable to the passage of water, with certification by a registered professional engineer or architect (§ 28.10.010(C)(2)). Manufactured homes in Zones A1-30, AH and AE need the lowest floor at or above the base flood elevation, and in some existing parks the chassis can instead sit on piers no less than thirty-six inches in height above grade (§ 28.10.040).

The base flood elevation itself comes from § 28.08.030(B). The administrator uses any base flood elevation and floodway data available from a federal or state agency or other source and submits it to the city council for adoption. If none exists, the elevation is obtained by one of two methods from the FEMA publication dated July 1995: a simplified method using the Quick-2 program, or a detailed method using the HEC-HMS and HEC-RAS programs. Subdivision proposals must identify the special flood hazard area and the elevation of the base flood, and a site filled above the base flood elevation needs certified lowest floor and pad elevations (§ 28.10.030). When physical alterations change the base flood elevation, the administrator submits data to FEMA for a letter of map revision within six months of information becoming available or project completion, whichever comes first (§ 28.08.030(D)).

Violations & Fines

A structure or development in the City of Palm Desert without the elevation certificate, other certifications or other evidence of compliance required by Title 28 is presumed to be in violation until the documentation is provided (§ 28.04.010). A violation is a misdemeanor under § 28.06.030, and the city council can take any lawful action needed to prevent or remedy it. Building permits cannot be issued on a conditional letter of map revision, and letters of map revision for flood control projects must be approved before building permits issue (§ 28.08.030(D)).

Frequently Asked Questions

How high must the lowest floor be in a City of Palm Desert A zone?
Section 28.10.010(C)(1)(b) requires the lowest floor, including a basement, to be elevated to or above the base flood elevation. The base flood elevation is determined by one of the methods in Section 28.08.030(B). The code adds that the State of California recommends at least two feet above the base flood elevation, but that is a recommendation, not the city requirement.
What applies in an AO zone in Palm Desert?
The lowest floor must be elevated above the highest adjacent grade to a height equal to or exceeding the depth number specified in feet on the FIRM. If no depth number is specified, the floor must be at least two feet above the highest adjacent grade. The state recommends more, but Section 28.10.010(C)(1)(a) sets the city minimum at the depth number or two feet.
Who certifies the finished floor elevation?
A registered professional engineer or surveyor certifies the elevation of the lowest floor, including a basement, once the structure is complete. The community building inspector then verifies that the floor is properly elevated, and both the certification and verification are provided to the floodplain administrator under Section 28.10.010(C)(1).
What if no base flood elevation has been published for the property?
Section 28.08.030(B) tells the floodplain administrator to use any available federal, state or other source data and submit it to the city council for adoption. If nothing exists, the base flood elevation is obtained by the simplified or detailed method from the FEMA guide dated July 1995 for approximate Zone A areas.

Sources & Official References

Other rules in Palm Desert

All Palm Desert rules

California rules heatmap·Compare Palm Desert to another location·View the California environmental rules overview

Get notified when Flood Elevation Requirements in Palm Desert, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Elevation Requirements in Nearby Cities

How other cities in Riverside County handle flood elevation requirements.

Menifee, CA
Some Restrictions
Murrieta, CA
Some Restrictions
Temecula, CA
Some Restrictions
Riverside, CA
Some Restrictions
Palm Springs, CA
Some Restrictions
Corona, CA
Significant Restrictions
Moreno Valley, CA
Significant Restrictions