Key Facts
- A zone and other zones
- Lowest floor at or above base flood elevation
- AO zone
- At or above the FIRM depth number, or two feet if none printed
- State recommendation
- Two feet above base flood elevation, printed as a recommendation
- Certification
- Registered professional engineer or surveyor, verified by building inspector
- Manufactured home piers
- Chassis piers no less than thirty-six inches above grade
- LOMR deadline
- Six months after data or project completion, whichever is first
Summary
In the City of Palm Desert, new residential construction and substantial improvements in a special flood hazard area need the lowest floor, including any basement, at or above the base flood elevation in an A zone and in all other zones. In an AO zone the floor must clear the FIRM depth number. The two-foot margin appears only as a State of California recommendation.
C. Elevation and Flood Proofing. ... 1. Residential construction, new or substantial improvement, shall have the lowest floor, including basement: a. In an AO zone, elevated above the highest adjacent grade to a height equal to or exceeding the depth number specified in feet on the FIRM, or elevated at least two feet above the highest adjacent grade if no depth number is specified. ... b. In an A zone, elevated to or above the base flood elevation; said base flood elevation shall be determined by one of the methods in Section 28.08.030(B) of this title. The state of California recommends the lowest floor be elevated at least two feet above the base flood elevation, as determined by the community. c. In all other zones, elevated to or above the base flood elevation. The state of California recommends the lowest floor be elevated at least two feet above the base flood elevation. Upon the completion of the structure, the elevation of the lowest floor including basement shall be certified by a registered professional engineer or surveyor, and verified by the community building inspector to be properly elevated.
Full Breakdown
The elevation rule sits in § 28.10.010(C)(1) of the Palm Desert Municipal Code and applies in all areas of special flood hazards. New residential construction and substantial improvements must have the lowest floor, including a basement, at a set height that depends on the zone on the FIRM. In an AO zone the lowest floor must be elevated above the highest adjacent grade to a height equal to or exceeding the depth number specified in feet on the FIRM, or at least two feet above the highest adjacent grade if no depth number is specified. In an A zone and in all other zones, the lowest floor must be elevated to or above the base flood elevation. The code prints the State of California's recommendation of two feet above the base flood elevation in those zones, but the city's own requirement is to or above the base flood elevation. When the structure is complete, a registered professional engineer or surveyor certifies the lowest floor elevation, the community building inspector verifies it, and the certification goes to the floodplain administrator.
Nonresidential buildings can be elevated the same way or flood proofed so the structure is watertight with walls substantially impermeable to the passage of water, with certification by a registered professional engineer or architect (§ 28.10.010(C)(2)). Manufactured homes in Zones A1-30, AH and AE need the lowest floor at or above the base flood elevation, and in some existing parks the chassis can instead sit on piers no less than thirty-six inches in height above grade (§ 28.10.040).
The base flood elevation itself comes from § 28.08.030(B). The administrator uses any base flood elevation and floodway data available from a federal or state agency or other source and submits it to the city council for adoption. If none exists, the elevation is obtained by one of two methods from the FEMA publication dated July 1995: a simplified method using the Quick-2 program, or a detailed method using the HEC-HMS and HEC-RAS programs. Subdivision proposals must identify the special flood hazard area and the elevation of the base flood, and a site filled above the base flood elevation needs certified lowest floor and pad elevations (§ 28.10.030). When physical alterations change the base flood elevation, the administrator submits data to FEMA for a letter of map revision within six months of information becoming available or project completion, whichever comes first (§ 28.08.030(D)).
Violations & Fines
A structure or development in the City of Palm Desert without the elevation certificate, other certifications or other evidence of compliance required by Title 28 is presumed to be in violation until the documentation is provided (§ 28.04.010). A violation is a misdemeanor under § 28.06.030, and the city council can take any lawful action needed to prevent or remedy it. Building permits cannot be issued on a conditional letter of map revision, and letters of map revision for flood control projects must be approved before building permits issue (§ 28.08.030(D)).
Frequently Asked Questions
How high must the lowest floor be in a City of Palm Desert A zone?
What applies in an AO zone in Palm Desert?
Who certifies the finished floor elevation?
What if no base flood elevation has been published for the property?
Sources & Official References
Other rules in Palm Desert
California rules heatmap·Compare Palm Desert to another location·View the California environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Flood Elevation Requirements in Nearby Cities
How other cities in Riverside County handle flood elevation requirements.