Key Facts

Freeboard margin
One foot above base flood elevation
Residential structures
Must elevate; floodproofing not allowed
Non-residential structures
May floodproof or elevate
Governing section
SLDC Section 1.6.D(4)
Definition section
SLDC Section 9.9
Administering official
Director of Community Development

Summary

Sedona requires nonconforming structures that increase flood damage potential to be floodproofed or elevated to at least one foot above the base flood elevation, called the regulatory flood elevation, under Sedona Land Development Code Section 1.6.D(4).

(4) Enlargements, alterations, and repairs to nonconforming structures that would otherwise be permitted by this Code and that would result in an increase to the flood damage potential shall require floodproofing or shall be elevated to or above the regulatory flood elevation. For nonconforming residential structures, such structures shall be elevated to or above the regulatory flood elevation and floodproofing shall not be an option to comply with these standards. ... Regulatory Flood Elevation One foot above the base flood elevation for a watercourse.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Initiative Ordinance 2026-01, approved by voters at the July 21, 2026 election).

Full Breakdown

9, Other Defined Terms). 6, Nonconformities. D(4), when an enlargement, alteration, or repair to a nonconforming structure would otherwise be allowed by the Code but would increase the structure's flood damage potential, the owner has two paths for a non-residential structure: floodproof it, or elevate it to or above the regulatory flood elevation. For nonconforming residential structures the choice disappears entirely: floodproofing is not an option, and the structure must be elevated to or above the regulatory flood elevation. D(2) ties permissible exterior modification to percentage-of-floor-area and valuation thresholds tied to the International Building Code) before full Code conformance is required.

B(5) separately allows compliance "to the maximum extent practicable" when floodplains or other environmental constraints leave a lot without enough developable area to fully meet the Code's standards. B(5) references floodplains among the site constraints the Director weighs, and building height along Oak Creek can be measured from the regulatory floodplain elevation established by the City's floodplain management study (Article 2). D(2) triggers full-Code compliance rather than the narrower freeboard-only fix.

Violations & Fines

A nonconforming structure that is enlarged, altered, or repaired without meeting the freeboard requirement in Section 1.6.D(4) is out of compliance with the Land Development Code, and the work can be halted. The City Engineer and Community Development Director review flood-related site work, and unpermitted grading, filling, or construction in a drainage way or floodplain is separately barred without authorization under the Engineering Manual (Section 5.2). Noncompliant elevation or floodproofing work found during permitting review must be corrected before the City will sign off on the modification, and residential structures cannot substitute floodproofing for the elevation requirement under any circumstance.

Frequently Asked Questions

What counts as Sedona's regulatory flood elevation?
The Land Development Code defines it in Section 9.9 as one foot above the base flood elevation for a watercourse. That one-foot freeboard margin is the benchmark used whenever the Code requires a structure to be elevated above flood level, rather than the FEMA base flood elevation alone.
Can I floodproof my house instead of raising it?
Not if it is a nonconforming residential structure. Section 1.6.D(4) says floodproofing is not an option for nonconforming residential structures; they must be elevated to or above the regulatory flood elevation. Non-residential nonconforming structures may choose either floodproofing or elevation.
When does the flood elevation rule apply to my remodel?
It applies when an enlargement, alteration, or repair to a nonconforming structure would otherwise be permitted by the Code but would increase the structure's flood damage potential. At that point Section 1.6.D(4) requires floodproofing or elevation to the regulatory flood elevation before the work can proceed.
Who reviews flood elevation compliance in Sedona?
The Director of Community Development administers the nonconformities standards in Section 1.6, and the City Engineer reviews related site work such as grading, filling, or construction in a drainage way or floodplain under the City's Engineering Manual.

Sources & Official References

Other rules in Sedona

All Sedona rules

Compare Sedona to another location·View the Arizona environmental rules overview

Get notified when Flood Elevation Requirements in Sedona, AZ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.