Allentown, PA Environmental Rules: Flood Zones (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

FEMA flood zone rules in Allentown, PA, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.

Key Facts

Permit authority
Floodplain Manager, § 298-4
Governing maps
FEMA FIRM/FIS dated 7-16-2004
Floodway rule
No-rise study required for encroachment
Max fine
$600 plus costs, or 90 days
Appeal deadline
30 days to Zoning Hearing Board

Summary

Allentown requires a Floodplain Manager permit before any construction or development in an identified floodplain area. The city maps floodway, AE, A, AO and AH zones off FEMA's July 16, 2004 Flood Insurance Rate Maps, and floodway encroachments generally need a no-rise engineering study.

It shall be unlawful for any person, partnership, business or corporation to undertake, or cause to be undertaken, any construction or development anywhere within an identified floodplain area within the City of Allentown unless a permit has been obtained from the Floodplain Manager.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4995055; v49 updated 2026-06-26; through 06-26-2026).

Full Breakdown

Chapter 298, adopted February 16, 2022 by Ordinance No. 15789, makes it unlawful under § 298-4 to undertake construction or development anywhere within an identified floodplain area without a permit from the city's Floodplain Manager; § 298-11 restates the same permit requirement. The Floodplain Manager, appointed under § 298-10 (or the Director of Community and Economic Development if the post is vacant), reviews applications for conformance with the chapter and all other applicable codes.

Section 298-21 identifies the floodplain area as the special flood hazard areas (SFHAs) shown on FEMA's Flood Insurance Study and Flood Insurance Rate Maps dated July 16, 2004, or the most recent revision, and adopts those maps into the chapter. Section 298-22 breaks the identified area into four districts: the Floodway, where no fill, new construction or other development is allowed unless a hydrologic and hydraulic analysis shows no increase in flood levels, and where any new construction also needs a Department of Environmental Protection permit; the AE Area, split into segments with and without a mapped floodway, the latter requiring the same no-rise demonstration; the A Area, where no base flood elevation is mapped and the city may require the lowest floor at least three feet above the highest adjacent grade absent better data; and the AO/AH Area, subject to one-to-three-foot shallow flooding, where drainage paths must route water around structures. Section 298-26D also bars new construction within 50 feet landward of a watercourse's top of bank, except for bridges, docks, piers, utilities and specified low-impact improvements.

Appeals from a Floodplain Manager decision go to the Zoning Hearing Board within 30 days under § 298-20, with further appeal to the Lehigh County Court, and the city may set a filing fee by ordinance for that appeal.

Violations & Fines

Under § 298-19, failing to comply with Chapter 298 or with a Floodplain Manager notice or order is punishable, upon conviction, by a fine of up to $600 plus prosecution costs, imprisonment of up to 90 days, or both, with each day of continued noncompliance treated as ongoing. The city may also pursue an equity action, and a noncompliant structure or use can be declared a public nuisance and abated.

Frequently Asked Questions

Do I need a permit to build in an Allentown flood zone?
Yes. Section 298-4 makes it unlawful to undertake any construction or development within an identified floodplain area without first getting a permit from the city's Floodplain Manager, who checks the project against Chapter 298 and all other applicable codes before issuing it.
How does Allentown decide which areas count as floodplain?
Section 298-21 adopts FEMA's Flood Insurance Study and Flood Insurance Rate Maps dated July 16, 2004 (or the latest revision) as the identified floodplain area, then § 298-22 splits that area into Floodway, AE, A and AO/AH zones with different building rules.
Can I build in the Allentown floodway?
Only if you can show it will not raise flood levels. Section 298-22A(1) bars fill, new construction or other development in the floodway unless a hydrologic and hydraulic analysis proves no increase in the base flood discharge elevation, and a DEP permit is also required.
What happens if I build without a floodplain permit in Allentown?
Section 298-19 sets a fine of up to $600 plus prosecution costs, up to 90 days imprisonment, or both, and lets the Floodplain Manager declare the noncompliant structure a public nuisance subject to abatement in addition to the fine.

Sources & Official References

Other rules in Allentown

All Allentown rules

Compare Allentown to another location·View the Pennsylvania environmental rules overview

Get notified when Flood Zones in Allentown, PA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.