FEMA flood zone rules in Terrebonne Parish, LA, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.

Key Facts

Applies to
All special flood hazard areas, parish + former Houma
Permit required
Flood control/utility permit before construction
Enforcing official
Floodplain administrator (planning & zoning director)
Certification
LA-registered engineer, surveyor, or architect
Penalty
Up to $100 fine or 30 days jail, per day
Correction window
5 to 30 days after notice

Summary

Terrebonne Parish Code Chapter 9 governs every area of special flood hazard across the parish and the former City of Houma. A flood control/utility permit from the floodplain administrator, the director of planning and zoning, is required before any new construction, substantial improvement, or structural addition, and the finished structure must be anchored against flotation, collapse, and hydrostatic loads.

These county ordinances apply to unincorporated areas of Terrebonne Parish. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Any person violating any provision of this chapter shall be so notified by certified return receipt mail of the specific violation and given no less than five (5) days and no more than thirty (30) days to either remove the unlawful structure, if it is prohibited, or cause it to conform to the provisions of this chapter, if it is an authorized structure or repair-related activity. ... This chapter shall apply to all areas of special flood hazard within the jurisdiction of Terrebonne Parish and the City of Houma. ... A development permit shall be required to ensure conformance with the provisions of this chapter. ... All new construction and substantial improvements ... shall be designed (or modified) and adequately anchored to prevent flotation, collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy

Full Breakdown

Chapter 9, Flood Damage Prevention, applies to all areas of special flood hazard within Terrebonne Parish and the former City of Houma (Sec. 9-7), and it requires a development permit to ensure conformance with its provisions (Sec. 5). Under the compliance procedure in Sec. 9-32, an applicant for new construction, a substantial improvement, or a structural addition must file a flood control/utility permit application with the floodplain administrator, supported by a site plan, existing easements and rights-of-way, and, for sites in a special flood hazard zone, a natural ground elevation certificate from a Louisiana-registered professional engineer, surveyor, or architect.

Utilities cannot legally be connected or reconnected to a structure until compliance is certified (Sec. 9-9), and no structure or land can be located, altered, or have its use changed without full compliance with the chapter (Sec. 9-10). Sec. 9-56 sets general flood hazard reduction standards parish-wide: new construction and substantial improvements must be designed and anchored to prevent flotation, collapse, or lateral movement from hydrodynamic and hydrostatic loads, built with flood-damage-resistant methods and materials, and have electrical, heating, plumbing, and HVAC equipment located to keep water out during flooding.

New sanitary landfills and new or expanded hazardous waste sites, including saltwater injection wells, are barred outright in these areas. The floodplain administrator, the director of planning and zoning or a designee, reviews applications, issues permits, and certifies finished-floor elevations before a certificate of occupancy is issued.

Violations & Fines

Under Sec. 9-2, anyone who violates Chapter 9 is notified by certified mail and given five to thirty days to remove or bring an unlawful structure into compliance. Failure to comply is punishable by a fine of up to one hundred dollars and up to thirty days in jail per offense, with each day of continued violation a separate offense; the parish can also seek an injunction or mandamus to stop the work or force compliance.

Frequently Asked Questions

Do I need a permit to build in a Terrebonne Parish flood zone?
Yes. Sec. 9-8.5 requires a development permit before any new construction, substantial improvement, or structural addition in an area of special flood hazard, and Sec. 9-32 requires the application to include a site plan and, where applicable, a ground elevation certificate from a Louisiana-registered engineer, surveyor, or architect before the floodplain administrator will issue it.
What happens if I skip the flood control permit?
The floodplain administrator can notify you by certified mail and give five to thirty days to remove or correct the unlawful work under Sec. 9-2. Continuing the violation brings a fine of up to one hundred dollars, up to thirty days in jail, or both, with every additional day counted as a new offense.
Who decides whether my lot is in a flood hazard area?
The floodplain administrator, who is the director of planning and zoning or a designee, interprets the FEMA flood insurance rate maps for Terrebonne Parish and the former City of Houma and resolves any conflict between a mapped boundary and actual field conditions under Sec. 9-31.

Sources & Official References

Other rules in Terrebonne Parish

All Terrebonne Parish rules

Compare Terrebonne Parish to another location·View the Louisiana environmental rules overview

Get notified when Flood Zones in Terrebonne Parish, LA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.