Weston, FL Environmental Rules: Flood Zones (2026)
FEMA flood zone rules in Weston, FL, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.
Key Facts
- Governing chapter
- Chapter 64, Ord. 2014-11 (2014)
- Permit required
- Floodplain Administrator permit before covered development
- Scope
- Fill, grading, pools, manufactured homes, tanks, RVs
- Presumed violation
- Missing lowest-floor elevation documentation, § 64.60
- Enforcement tool
- Stop-work orders issued under § 64.61
Summary
Any development wholly or partly inside a Weston flood hazard area, from subdividing land to installing a pool or a manufactured home, falls under Chapter 64's Floodplain Management Ordinance. Section 64.30 requires a permit from the Floodplain Administrator, and the Building Official where applicable, before work starts, and no permit issues until the project meets Chapter 64 and all other applicable codes.
The provisions of this Floodplain Management Ordinance, (hereinafter referred to as "this Chapter") shall apply to all Development that is wholly within or partially within any Flood Hazard Area including but not limited to the subdivision of land; ... Construction , alteration, remodeling, enlargement, improvement, replacement, repair, relocation or demolition of Buildings , Structures , and facilities that are exempt from the Florida Building Code ; ... installation of swimming pools; and any other Development . ... Any Owner or Owner's authorized agent (hereinafter "Applicant") who intends to undertake any Development activity within the scope of this Chapter, ... which is wholly within or partially within any Flood Hazard Area shall first make application to the Floodplain Administrator , and the Building Official if applicable, and shall obtain the required permit(s) and approval(s). No such permit or approval shall be issued until compliance with the requirements of this Chapter and all other applicable codes and regulations has been satisfied.
Full Breakdown
Weston's Floodplain Management Ordinance, Chapter 64 of the City Code, was adopted by Ordinance 2014-11 in 2014 to keep the City eligible for the National Flood Insurance Program under 44 C.F.R. §§ 59-60. Section 64.01 sets a broad scope: it reaches subdivision of land, filling and grading and other site work, utility installations, construction and alteration of buildings and structures exempt from the Florida Building Code, placement or replacement of manufactured homes, installation or replacement of tanks, placement of recreational vehicles, installation of swimming pools, and any other development inside a flood hazard area.
Section 64.30 backs that scope with a permit requirement: any owner or authorized agent who intends development within the chapter's scope must first apply to the Floodplain Administrator, and the Building Official where applicable, and obtain the required permits and approvals before starting; no permit or approval issues until the project satisfies Chapter 64 and every other applicable code. Section 64.31 layers on a federally driven list of otherwise Building-Code-exempt structures, including railroads, farm buildings, temporary construction sheds, utility structures, tribal chickees, small family mausoleums, and correctional temporary housing, that still need a floodplain permit if they sit in a mapped flood hazard area.
Violations are defined in § 64.60 as development performed without a permit, in conflict with an issued permit, or missing required elevation documentation, and the Floodplain Administrator can issue stop-work orders under § 64.61 to halt noncompliant work in progress.
Violations & Fines
Section 64.60 deems any Chapter 64 development performed without a permit, in conflict with an issued permit, or lacking required elevation certification a violation, and a structure without documentation of its lowest-floor elevation is presumed noncompliant until the owner produces it. The Floodplain Administrator can issue a stop-work order under § 64.61, and continuing work after a stop-work order under § 64.62 exposes the responsible party to penalties prescribed by law, including the citywide general penalty in § 2.99.
Frequently Asked Questions
Do I need a permit to fill or grade land in a Weston flood zone?
What happens if I build in a flood hazard area without a permit?
Does installing a swimming pool trigger Weston's floodplain rules?
Sources & Official References
Other rules in Weston
Florida rules heatmap·Compare Weston to another location·View the Florida environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Flood Zones in Nearby Cities
How other cities in Broward County handle flood zones.