Key Facts

Silt screens
Required between cleared site and water body
Post-construction
Retain or replace natural vegetation
Fill slope limit
4 horizontal to 1 vertical above -3 ft
Waterway creation
City Engineer permit required first
BMP standard
Latest FDEP Erosion and Sediment Control Criteria
Max penalty
$15,000/violation if irreparable (§ 2.99)

Summary

In the City of Weston, Florida, clearing a lot next to a lake or canal triggers erosion controls under Weston Code of Ordinances § 127.42(B)(1). Silt screens must separate the construction site from the water body, and natural vegetation must be retained or replaced afterward, on top of the city's FDEP-based Best Management Practice standard.

127.42(B)(1)(d) After construction, natural vegetation shall be retained or replaced on the site in order to minimize and stabilize erosion and decrease pollution of the water body. ... 127.42(B)(1)(e) For lots or parcels which are cleared adjacent to water bodies, silt screens shall be placed between the construction site and the water body to prevent erosion and siltation.

Full Breakdown

Chapter 127's waterway design standards, § 127.42(B)(1), govern any lot or parcel cleared adjacent to a lake, canal or other water body in Weston. Subsection (d) requires that after construction, natural vegetation be retained or replaced on the site to minimize and stabilize erosion and decrease pollution of the water body. Subsection (e) requires silt screens between the construction site and the water body itself to prevent erosion and siltation while the ground is exposed. These sit alongside related design controls in the same section: proposed lakes or canals need written conceptual approval from the South Florida Water Management District (and FDEP, DNR or the Army Corps where applicable) before construction, fill slopes created by deposition cannot exceed four horizontal feet to one vertical foot above a point three feet below the design water elevation, and no waterway may be created without a permit first approved in writing by the City Engineer, who then inspects the waterway and its structures during construction.

Separately, § 127.41(F) sets the city's general Best Management Practice standard for stormwater and wetland pollution control, adopting by reference the latest edition of the National Pollution Discharge Elimination System requirements and the latest edition of the FDEP Erosion and Sediment Control Criteria. Chapter 127 does not carry its own dedicated fine for these provisions, so enforcement falls to the citywide general penalty at § 2.99.

Violations & Fines

Because Chapter 127 sets no specific fine for its erosion and waterway provisions, violations default to the citywide general penalty, § 2.99: up to $1,000 per day for a first violation, up to $5,000 per day for a repeat violation, and up to $15,000 per violation if it is deemed irreparable or irreversible, or imprisonment up to 60 days, or both. Each day a violation continues is a separate offense.

Frequently Asked Questions

Does Weston require silt screens on construction sites near water?
Yes. Weston Code of Ordinances § 127.42(B)(1)(e) requires silt screens between the construction site and the water body whenever a lot or parcel adjacent to a lake, canal or other water body is cleared, specifically to prevent erosion and siltation into the receiving water body during grading and land-clearing work.
What happens to vegetation on a site after construction is done?
Under § 127.42(B)(1)(d), natural vegetation must be retained on site or replaced once construction is complete. The code states the purpose is to minimize and stabilize erosion and decrease pollution of the adjacent water body, so bare, exposed soil left after grading is a code violation.
Is there a numeric or technical erosion-control standard the city applies?
Yes. § 127.41(F) adopts the latest edition of the National Pollution Discharge Elimination System requirements and the latest edition of the FDEP Erosion and Sediment Control Criteria as the city's Best Management Practice standard for stormwater and wetland pollution control on permitted projects.
Who enforces Weston's erosion-control rules and what is the penalty?
The City Engineer administers Chapter 127's waterway and design standards. Because Chapter 127 sets no specific fine, violations fall under the citywide general penalty, § 2.99: up to $1,000 per day for a first offense, $5,000 per day for a repeat violation, $15,000 if irreparable, or up to 60 days in jail.

Sources & Official References

Other rules in Weston

All Weston rules

Florida rules heatmap·Compare Weston to another location·View the Florida environmental rules overview

Get notified when Erosion Control in Weston, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Broward County handle erosion control.

Hollywood, FL
Some Restrictions
Pembroke Pines, FL
Some Restrictions
Pompano Beach, FL
Some Restrictions