Wicomico County, MD Environmental Rules: Flood Zones (2026)
FEMA flood zone rules in Wicomico County, MD, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.
Key Facts
- Permit required for
- filling, grading, construction in flood hazard areas
- Administering official
- County Floodplain Administrator
- Permit validity
- work must start within 180 days
- NFIP participation since
- September 28, 1984
- Max misdemeanor fine
- $1,000, plus up to 30 days jail
- Governing map
- Flood Insurance Study dated 8-17-2015
Summary
It's unlawful to build, fill, grade or place a manufactured home in a special flood hazard area of unincorporated Wicomico County without a floodplain development permit from the county under Chapter 149, on top of any state or federal approvals.
It shall be unlawful for any person to begin any development or construction which is wholly within, partially within, or in contact with any flood hazard area established in § 149-5, including but not limited to: filling; grading; construction of new structures; the substantial improvement of buildings or structures, including repair of substantial damage; placement or replacement of manufactured homes, including substantial improvement or repair of substantial damage of manufactured homes; erecting or installing a temporary structure, or alteration of a watercourse, until a permit is obtained from Wicomico County, Maryland. No such permit shall be issued until the requirements of these regulations have been met. ... A person who does not comply with the conditions of a permit issued pursuant to the provisions of this chapter is guilty of a misdemeanor and, upon conviction, shall be subject to a fine of not less than $100 and not to exceed $1,000 or imprisonment for a period not to exceed 30 days, or both. Each day during which any violation of this chapter continues shall constitute a separate offense.
Full Breakdown
Wicomico County Code § 149-14A makes it unlawful to begin any development or construction wholly or partly within, or in contact with, a flood hazard area established under § 149-5, including filling, grading, new construction, substantial improvement, manufactured home placement or replacement, temporary structures, or watercourse alteration, until a county permit is obtained; no permit issues until the chapter's requirements are met. 04 (§ 149-14B). A permit is valid only if work actually starts within 180 days of issuance, though the Floodplain Administrator, the Director of Planning, Zoning and Community Development or a designee (§ 149-11), may grant extensions of up to 90 days each (§ 149-14C).
Applications must include scaled site plans, existing ground elevation, delineation of flood zones and setbacks, and for larger subdivisions or developments, base flood elevation determinations (§ 149-15). Wicomico County has participated in the National Flood Insurance Program since September 28, 1984, and all development since that date must comply with these regulations, which are based on the county's Flood Insurance Study dated August 17, 2015 and the accompanying FIRMs (§ 149-1B, § 149-5A). Where a conflict arises with other county ordinances, the more restrictive rule controls (§ 149-6).
Violations & Fines
A person who fails to obtain a required floodplain permit, or who does not comply with the conditions of one that was issued, is guilty of a misdemeanor under § 149-50A, punishable by a fine of not less than $100 and not more than $1,000, imprisonment up to 30 days, or both; each day the violation continues is a separate offense, and further work must stop until the violation is corrected. The Floodplain Administrator can issue a written notice of violation or stop-work order listing the sections violated and the corrective deadline (§ 149-49), and the Federal Insurance Administrator must be notified within 30 days of any citation requiring a fine or court appearance; a structure that remains in violation can be denied new or renewed federal flood insurance (§ 149-50B).
Frequently Asked Questions
Do I need a county permit to build in a Wicomico County flood zone?
How long is a Wicomico County floodplain permit good for?
What happens if I develop in the floodplain without a permit?
Which map determines whether my property is in a flood hazard area?
Sources & Official References
Other rules in Wicomico County
Compare Wicomico County to another location·View the Maryland environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.