Bothell, WA Environmental Rules: Stormwater Management (2026)
Key Facts
- Permits
- Right-of-way, storm drainage side sewer, grading, utility
- Drainage plan
- Required with development permit applications, except listed permits
- Facility maintenance
- Owner cleans at least annually; annual city inspection
- Order to maintain
- Response due within 30 calendar days of written notice
- Enforcing official
- Public works director
- Discharge temperature limit
- Not more than five degrees Fahrenheit above receiving water
Summary
In the City of Bothell, Washington, no one can add to, extend or improve the storm drainage system without a permit. The Bothell storm water and drainage control code, Chapter 18.04, sorts the work into right-of-way, storm drainage side sewer, grading and utility permits, and the public works director enforces it.
No person shall make any additions, betterments or extensions to the existing storm drainage system without first obtaining a permit to do so. The following permits apply to grading, excavating, and storm drainage system work: A. ROW Permit. A right-of-way invasion permit shall be required whenever storm drainage system additions, betterments or extensions are made within the street right-of-way or a public easement. B. Storm Drainage Side Sewer Permit. A storm drainage side sewer permit shall be required for the construction of any storm drainage side sewer or on-site storm drainage system. C. Grading Permit. A grading permit shall be required whenever grading activities are performed. D. Utility Permit. A utility permit shall be required for any infrastructure improvements that include storm water revisions not associated with ROW, grading, or storm drainage side sewer permit.
Full Breakdown
Bothell Municipal Code § 18.04.040 requires a permit before any additions, betterments or extensions to the existing storm drainage system. Four permits apply: a right-of-way invasion permit for work in the street right-of-way or a public easement, a storm drainage side sewer permit for any side sewer or on-site storm drainage system, a grading permit whenever grading is performed, and a utility permit for infrastructure improvements with storm water revisions not covered by the other three. BMC 18.04.020 states the purpose: preventing siltation of the city's creeks, streams, rivers and lakes, and protecting adjacent owners from increased runoff that could cause flooding and erosion.
BMC 18.04.070 requires every applicant for a development permit to submit a drainage plan under the Bothell Standards. The exceptions are administrative interpretations, sign, street vacation, street use, hydrant use, plumbing, electrical, mechanical, sewer connection and water meter permits, and interior alterations with no change of use. Under BMC 18.04.080 new work must follow the storm drainage comprehensive plan, KCSWDM and the Bothell Standards, with the fee set by resolution. BMC 18.04.290 places all real property within the city limits inside the city's municipal separate storm sewer system.
Maintenance falls on the owner. BMC 18.04.270 makes the property owner responsible, at the owner's expense, for private storm water and drainage systems, requires facilities to be cleaned at least annually, and subjects them to annual inspection by the director. An order to maintain must be answered within 30 calendar days and becomes final after 30 calendar days unless appealed to the director. BMC 18.04.260 bans discharging anything other than storm water into the storm drain system, including silt, sediment, concrete, cement and gravel, and bars discharge water more than five degrees Fahrenheit warmer than the receiving water.
Violations & Fines
BMC 18.04.500 subjects violators to the civil and criminal penalties of Chapter 11.20 BMC, with each day of continued violation a separate violation, and allows a reinspection fee. Violations of BMC 18.04.260 are excluded from the $250.00 per day maximum in BMC 11.20.010 and incur penalties set elsewhere in that section. Anyone responsible for a pollutant discharge also pays the city's abatement and restoration costs, and the director can issue a stop work order for connections made without a permit (BMC 18.04.600).
Frequently Asked Questions
Which permit do I need for storm drainage work in the City of Bothell?
Do I need a drainage plan with my building application?
Who maintains a private stormwater pond or pipe?
What can go down a Bothell storm drain?
Sources & Official References
Other rules in Bothell
Compare Bothell to another location·View the Washington environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.