Lenexa, KS Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Plan required for
New development and redevelopment in Lenexa
Plan preparer
Professional engineer licensed in Kansas
Approving official
Engineering and Construction Services Administrator
Performance bond
1.25 times construction cost of the facility
Public facility warranty
2-year maintenance bond
City inspection cycle
Yearly for two years, then every three years

Summary

In the City of Lenexa, Kansas, new development and redevelopment cannot increase the quantity and rate of stormwater leaving a site without an approved stormwater management plan sealed by a Kansas professional engineer. No building permit issues until the Engineering and Construction Services Administrator approves it.

No development shall increase the quantity and rate of stormwater emanating from said land areas except in accordance with an approved stormwater management plan as provided in these regulations. The storm water management plan shall be prepared by a professional engineer licensed in the State of Kansas. No building permits shall be issued until and unless the stormwater management plan has been approved by the Engineering and Construction Services Administrator.

Full Breakdown

Article 4-5-E of the Lenexa City Code applies to any person proposing new development or redevelopment in the City, who must apply to the Community Development Director for plan approval (Section 4-5-E-2). Section 4-5-E-9 then bars any increase in the quantity and rate of runoff except under an approved plan, requires a Kansas-licensed professional engineer to prepare it, and holds back building permits until the Engineering and Construction Services Administrator signs off.

Review runs in two stages. The preliminary plan is submitted with the preliminary development plan and must meet the Stormwater Management Plan Criteria and Plan Requirements dated July 2017, adopted by Ordinance No. 5678 (Section 4-5-E-10). The Administrator approves it only if the development will not cause flooding outside the existing flood plain during a 1% frequent flood, will not cause or increase flooding of existing structures, will not add unacceptable channel erosion, will not contribute sedimentation to channels or detention areas, and will not create adverse water quality impacts (Section 4-5-E-11). A final plan for each phase, signed and sealed by a Kansas engineer, comes before any building permit (Section 4-5-E-12). The Administrator can waive the plan for a single building or an addition with no significant drainage effect (Section 4-5-E-13). Design follows Section 5600 of the Kansas City Metropolitan Chapter of the American Public Works Association standards, dated February 16, 2011, with Lenexa amendments (Section 4-5-E-15).

Money and upkeep come next. The developer posts an irrevocable letter of credit or other performance bond at 1.25 times the estimated construction cost, released only when at least 90% of the served land area has permanent stabilization and all facilities are built (Section 4-5-E-17). Any portion dedicated to the public carries a 2-year maintenance bond (Section 4-5-E-18). Owners of private facilities must sign a recorded maintenance agreement before a building permit, and the City inspects facilities at least once each year for the first two years and every three years after (Section 4-5-E-21). Appeals go in writing to the Community Development Director within ten working days, then to the Governing Body (Section 4-5-E-24).

Violations & Fines

Section 4-5-E-22 starts with a written notice and a correction deadline. Failure leads to a posted stop work order, and ten days without correction is a public offense with a Notice to Appear in Municipal Court. The City can do the work itself, bill the owner or permittee, and certify unpaid amounts to the Johnson County Clerk as a lien on the tax bill. Section 1-1-C-3 caps fines at $2,500, with up to one year in jail, and each day counts separately.

Frequently Asked Questions

Do I need a stormwater plan to build in Lenexa?
Yes for new development or redevelopment. Section 4-5-E-2 says no land shall be developed except upon approval of a stormwater management plan, and Section 4-5-E-9 holds back building permits until it is approved. The Administrator can waive full requirements for a single building or an addition with no significant effect on drainage.
Who maintains a private detention basin in Lenexa?
The owner of the property. Section 4-5-E-21 makes owners of private facilities responsible for maintenance and requires a recorded maintenance agreement before a building permit issues. The agreement binds later owners, lets the City inspect at any time, and requires correction of violations. The City inspects yearly for two years, then every three years.
How large is the stormwater performance bond?
Section 4-5-E-17 sets it at 1.25 times the total construction cost of the stormwater facility, as estimated by the project designer and approved by the Engineering and Construction Services Administrator. It is released only when at least 90% of the served land area has permanent stabilization and the facilities are built to the Article.
How do I appeal a stormwater decision?
Submit a written request to the Community Development Director within ten working days after the Administrator's order or decision. If the Director denies the appeal, you can request a hearing before the Governing Body by filing with the City Clerk within 10 days after the denial, as Section 4-5-E-24 provides.

Sources & Official References

Other rules in Lenexa

All Lenexa rules

Compare Lenexa to another location·View the Kansas environmental rules overview

Get notified when Stormwater Management in Lenexa, KS changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.