Springfield, OH Environmental Rules: Stormwater Management (2026)
Key Facts
- Plan approver
- City Engineer
- Discharge review
- Service Director or designee
- Plan required before
- soil-disturbing activity begins
- Plan validity
- void after 1 year if work not started
- Core ban
- illicit discharges to stormwater system
Summary
Developers and redevelopers in the City of Springfield, Ohio must control stormwater runoff and file a Comprehensive Stormwater Management Plan before disturbing soil, and illicit discharges to the stormwater system are banned outright, under Springfield Codified Ordinances Chapter 961, enforced by the City Engineer and Service Director.
The purpose of this regulation is to establish technically feasible and economically reasonable stormwater management standards to achieve a level of stormwater quality and quantity control that will minimize damage to property and degradation of water resources and will promote and maintain the health, safety, and welfare of the citizens of the City of Springfield. ... No person or entity shall discharge or cause to be discharged any illicit discharge to the stormwater system.
Full Breakdown
Section 961.01 states the purpose of Chapter 961 is to set technically feasible, economically reasonable stormwater standards controlling both the quality and quantity of runoff to protect property and water resources. It requires owners who develop or redevelop property in Springfield to control runoff from their property, keep stormwater facilities properly designed, constructed and maintained, reduce water-quality impacts from new development, and control the volume, rate and quality of runoff so flooding and erosion potential are not increased. The chapter applies to highway and road projects, subdivisions, industrial, commercial, institutional and residential projects, farm building activities, and redevelopment and grading, per Section 961.01(c), but exempts activities already regulated under the Ohio Agricultural Sediment Pollution Abatement Rules and most linear utility or pipeline projects that do not add impervious surface.
Section 961.06 flatly prohibits discharging or causing an illicit discharge to the stormwater system, and bars non-agricultural earth-disturbing activity on land not otherwise regulated by a state or federal agency unless a Comprehensive Stormwater Management Plan required under Section 961.05 has first been submitted to and approved by the Service Director or designee; work inconsistent with an approved plan is likewise prohibited. Section 961.07 requires the plan, meeting the content requirements of Section 961.09, to be filed with the final plat, improvement plans, or a building, parking, or demolition permit application, and approved by the City Engineer before any soil-disturbing activity begins; approvals expire after one year if disturbance has not started. Section 961.08 makes clear that City approval does not excuse compliance with other federal, state or county permitting requirements.
Violations & Fines
Discharging, or causing the discharge of, an illicit substance to Springfield's stormwater system violates Section 961.06(a). Beginning non-agricultural earth-disturbing activity without a Service Director-approved Comprehensive Stormwater Management Plan required under Section 961.05, or disturbing soil in a way inconsistent with an approved plan, also violates Section 961.06. The City Engineer must approve the plan under Section 961.07 before any soil-disturbing work may lawfully start.
Frequently Asked Questions
Who approves a stormwater plan for new development in Springfield?
How long is a Springfield stormwater plan approval good for?
Is discharging into Springfield's storm drains ever allowed?
Sources & Official References
Other rules in Springfield
Compare Springfield to another location·View the Ohio environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.