Tyler, TX Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Plan Required
All developments
Prepared By
Texas-licensed P.E.
Residential BMPs
4 minimum (Table 10-542)
Non-Residential BMPs
11 minimum
Program
Phase II MS4 / TPDES

Summary

Tyler requires a stormwater management plan for every development. No building permit or subdivision construction plan is approved without one, prepared by a Texas-licensed Professional Engineer and using post-construction Best Management Practices under UDC Sec. 10-543.

No Building Permit application or Land Subdivision Construction Plans for development will be approved unless it includes a stormwater management plan outlining the Best Management Practices to be used. This plan must be prepared by an a Professional Engineer licensed to practice in the State of Texas and must indicate whether stormwater will be managed on-site or off-site and, if on-site, the general location and type of practices.

Source: Tyler Code of OrdinancesView official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: July 2026: Including amendments through July 22, 2026).

Full Breakdown

Tyler's Unified Development Code (Article VII) governs stormwater. Sec. 10-543 bars approval of any building permit or land subdivision construction plan unless it includes a stormwater management plan of Best Management Practices, prepared by a Texas-licensed Professional Engineer. Table 10-542 sets minimum BMPs: four for single- and two-family residential, and eleven for multifamily, office, commercial, industrial, and institutional uses. Sec. 10-541 requires controlling peak discharge and treating runoff to the maximum extent practicable. Tyler operates a Phase II MS4 program under its TPDES permit, and industrial sites must file a TPDES Notice of Intent.

Violations & Fines

Development without an approved stormwater plan is denied a permit or issued a stop-work order. Chapter 10 UDC violations carry fines up to $2,000 per day under Tyler Code Sec. 1-4.

Frequently Asked Questions

Do I need a stormwater plan for my project?
Yes. Tyler approves no building permit or subdivision construction plan without a stormwater management plan of Best Management Practices, prepared by a Texas-licensed Professional Engineer.
How many BMPs must a home site use?
Single- and two-family residential sites need at least four Best Management Practices; multifamily and commercial sites need eleven, per Table 10-542.

Sources & Official References

Other rules in Tyler

All Tyler rules

Texas rules heatmap·Compare Tyler to another location·View the Texas environmental rules overview

Get notified when Stormwater Management in Tyler, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.