Skip to main content
CityRuleLookup

Mesa, AZ Home Business: Home Daycare (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Large day care size
6 to 10 children
Registration required
Planning Division + AZ DHS certification
Street-facing signage
Not permitted
Play-area fence
6-foot solid, opaque
Separation from similar use
600 feet minimum

Summary

A Mesa home caring for 6 to 10 children, a Large Day Care Group Home, must register with the Planning Division, provide state health certification, keep no visible signage, and fence outdoor play areas with a 6-foot solid wall. Section 11-31-13 of the Zoning Ordinance also requires a 600-foot separation from any other large day care home.

A.The location of the home is registered with the Planning Division and evidence of certification by the Arizona Department of Health Services is provided to the City;B.No identification is visible from a public Street by signage, graphics, display, or other visual means;C.The building complies with all applicable building and fire safety regulations;D.A 6-foot-high solid (opaque) fence or wall is provided between all outdoor play areas and adjacent properties, except within the required Front Yard, in which fencing requirements shall comply with in the requirements of Section 11-30-4, Fences and Freestanding Walls; andE.A separation between large day care group homes of 600 feet or by the presence of significant intervening physical features between an existing large day care group home and the proposed large day care group home, such as arterial Streets, canals, parks, or similar buffering features or developments.

Source: ADHS Child Care LicensingView official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 22).

Full Breakdown

Mesa's zoning code separates home-based child care into two tiers by size: Small Day Care Home, for up to 5 children, and Large Day Care Home, for 6 to 10, defined in Title 11's use classifications as a facility whose primary use is a residence where care is regularly provided for compensation for less than 24 hours a day. Only the larger tier, the Large Day Care Group Home, carries its own standards section, § 11-31-13. Under that section, the home's location must be registered with the Planning Division, and the operator must provide the City with evidence of certification from the Arizona Department of Health Services.

No identification of the day care may be visible from a public street by signage, graphics, display, or other visual means, and the building itself must comply with all applicable building and fire safety regulations. Outdoor play areas must be enclosed by a 6-foot-high solid, opaque fence or wall separating them from adjacent properties, except that fencing within the required front yard must instead follow the general fence standards of § 11-30-4. Finally, a proposed large day care home must maintain a 600-foot separation from any other existing large day care group home, unless a significant intervening physical feature, an arterial street, canal, park, or similar buffering feature, sits between them.

The smaller Small Day Care Home tier (up to 5 children) is permitted in residential districts under the zoning use tables without triggering these additional § 11-31-13 standards.

Violations & Fines

Operating a Large Day Care Group Home without Planning Division registration and Arizona Department of Health Services certification, posting visible street-facing signage, or failing to install the required 6-foot solid outdoor play-area fence violates § 11-31-13 and is enforceable as a zoning code violation. A large day care sited within 600 feet of another large day care home without a qualifying intervening buffer also fails the separation standard and is not a lawful location under this section.

Frequently Asked Questions

How many children can I care for at home in Mesa without extra zoning standards?
Up to 5 as a Small Day Care Home. Once a home cares for 6 to 10 children it becomes a Large Day Care Group Home and must meet the registration, fencing, signage, and separation standards in § 11-31-13.
Do I need state certification to run a large home day care in Mesa?
Yes. Section 11-31-13(A) requires the location to be registered with the Planning Division and requires evidence of certification by the Arizona Department of Health Services to be provided to the City.
Can I put up a sign advertising my Mesa home day care?
No. Section 11-31-13(B) states no identification may be visible from a public street by signage, graphics, display, or other visual means for a Large Day Care Group Home.
How close can two large home day cares be to each other in Mesa?
At least 600 feet apart, per § 11-31-13(E), unless a significant intervening physical feature such as an arterial street, canal, or park separates the two properties.

Sources & Official References

Other rules in Mesa

All Mesa rules

Compare Mesa to another location·View the Arizona home business overview

Get notified when Home Daycare in Mesa, AZ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Home Daycare in Nearby Cities

How other cities in Maricopa County handle home daycare.

Scottsdale, AZ
Some Restrictions
Surprise, AZ
Some Restrictions
Gilbert, AZ
Some Restrictions
Phoenix, AZ
Some Restrictions
Tempe, AZ
Some Restrictions
Glendale, AZ
Some Restrictions
Goodyear, AZ
Significant Restrictions
Chandler, AZ
Significant Restrictions