Glen Cove, NY Hurricane Preparedness: Flood Elevation (2026)
Key Facts
- Governing section
- City Code § 154-18A
- Elevation required
- 2 feet above base flood elevation
- Applicable zones
- V1-V30, VE, V, moderate wave action
- Foundation rule
- No spread footings or fill for support
- Maximum fine
- $250 or 15 days, per § 154-9
Summary
In Glen Cove's coastal high-hazard flood zones, new and substantially improved homes must be elevated on pilings, columns, or shear walls to at least two feet above base flood elevation, per City Code § 154-18A. The rule targets storm-surge and wave forces from hurricanes and coastal storms, not routine inland flooding.
New construction and substantial improvements shall be elevated on pilings, columns or shear walls such that the bottom of the lowest horizontal structural member supporting the lowest elevated floor (excluding columns, piles, diagonal bracing attached to the piles or columns, grade beams, pile caps and other members designed to either withstand storm action or break away without imparting damaging loads to the structure) is elevated to or above two feet above base flood elevation so as not to impede the flow of water.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 5003439; v76 updated 2026-08-26; through 08-26-2026).
Full Breakdown
Chapter 154's coastal high hazard standards apply within Zones V1-V30, VE, or V, and in any area of moderate wave action, on the Flood Insurance Rate Map adopted at § 154-6, covering Glen Cove's harbor-facing shoreline where storm surge is the dominant flood risk. Under § 154-18A, new construction and substantial improvements must be elevated on pilings, columns, or shear walls so the bottom of the lowest horizontal structural member supporting the lowest floor sits at or above two feet above base flood elevation, keeping the structure clear of the flow of water during a storm.
Subsection B requires the structural design to account for wind and water loads acting simultaneously during the base flood, including wave impact, current drag, and waterborne debris, using wind values from the Building Code of New York State. Foundation standards in Subsection C bar the use of spread footings or fill for structural support, and Subsection D sets pile-spacing and penetration requirements, including a minimum penetration of five feet below mean sea level where the base flood elevation is +10 feet or less. Breakaway walls below the elevated floor, permitted under Subsection N, must be designed to fail under loads of no more than 20 pounds per square foot so a storm surge does not damage the elevated structure above.
These standards sit on top of the general encroachment and subdivision rules in § 154-15 and the anchoring and flood-resistant-materials requirements in § 154-16 that apply citywide.
Violations & Fines
Building or substantially improving a structure in a coastal high hazard zone without meeting the § 154-18 elevation and construction standards is a Chapter 154 violation under § 154-9, punishable by a fine of up to $250 or up to 15 days' imprisonment, with each day of noncompliance a separate offense. A structure that does not comply and lacks an approved variance is reported to FEMA.
Frequently Asked Questions
How high must a home be built in Glen Cove's coastal flood zone?
Why does Glen Cove require pilings instead of a solid foundation near the harbor?
What if a breakaway wall is installed below an elevated house?
Sources & Official References
Other rules in Glen Cove