Skip to main content
CityRuleLookup

Shoreline, WA Landscaping Rules: Rainwater Harvesting (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Small-system limit
600 gallons, under 4 ft wide and 4.5 ft tall
Large-system setback distance
2.5 ft side/rear, 15 ft front lot line
Large-system coverage cap
10% of the required yard setback
Commercial fee incentive
10% surface water fee reduction
Enforcing agency
Planning and Community Development
Misdemeanor penalty
up to $1,000 fine, 90 days jail

Summary

In the City of Shoreline, rain barrels, cisterns and other rainwater catchment systems may encroach into a required yard setback under SMC § 20.50.040(I)(1)(e). Small systems up to 600 gallons are allowed close to the property line if compact; larger systems face coverage and clearance limits, and commercial buildings can earn a utility fee discount for harvesting roof runoff.

e. Rain barrels, cisterns and other rainwater catchment systems may extend into a required yard setback according to the following: i. Cisterns, rain barrels or other rainwater catchment systems no greater than 600 gallons shall be allowed to encroach into a required yard setback if each cistern is less than four feet wide and less than four and one-half feet tall excluding piping. ii. Cisterns or rainwater catchment systems larger than 600 gallons may be permitted in required yard setbacks provided that they do not exceed 10 percent coverage in any required yard setback, and they are not located closer than two and one-half feet from a side or rear lot line, or 15 feet from the front lot line. If located in a front yard setback, materials and design must be compatible with the architectural style of the building which it serves, or otherwise adequately screened, as determined by the Director. iii. Cisterns may not impede requirements for lighting, open space, fire protection or egress.

Full Breakdown

The Shoreline Municipal Code treats rainwater catchment as a limited setback encroachment, not a use requiring its own permit. Under SMC § 20.50.040(I)(1)(e)(i), a cistern, rain barrel or catchment system of 600 gallons or less may sit inside a required yard setback if it is less than four feet wide and less than four and one-half feet tall, excluding piping. Larger systems, over 600 gallons, are permitted in a setback only if they cover no more than 10 percent of that required yard, stay at least two and one-half feet from a side or rear lot line, and at least 15 feet from the front lot line; a system placed in a front setback must match the building's architectural style or be screened, as the Director determines.

Cisterns may not block lighting, open space, fire protection or egress access required elsewhere in the Development Code. Enforcement of any setback encroachment that exceeds these limits runs through Planning and Community Development's general code enforcement authority under SMC § 20.30.770, which allows the Director to issue a Class 1 civil infraction or, for willful violations, refer the matter for a misdemeanor charge. Separately, Shoreline's Surface Water Management fee schedule (SMC § FEE.120(B)(4)) gives new or remodeled commercial buildings a 10 percent reduction in their surface water fee for installing a properly sized rainwater harvesting system that uses the available roof surface, citing RCW 35.67.020(3), with the City able to consider a larger reduction depending on how much rainwater is actually harvested.

Violations & Fines

Exceeding the size, coverage or setback-clearance limits for a rain barrel or cistern is a Development Code violation enforceable under SMC § 20.30.770. The Director may issue a Class 1 civil infraction under Chapter 7.80 RCW, and a person who willfully causes a violation is guilty of a misdemeanor punishable by a fine up to $1,000 and up to 90 days in jail, with each week of continued violation a separate offense. A notice-and-order violation carries a $500 civil penalty that escalates 150 percent for the next 14-day period and doubles thereafter. Appeals go to the Hearing Examiner within 14 days under SMC § 20.30.790.

Frequently Asked Questions

Can I put a rain barrel right next to my Shoreline property line?
Yes, if it holds 600 gallons or less and is less than four feet wide and four and one-half feet tall excluding piping, SMC § 20.50.040(I)(1)(e)(i) allows it to encroach into the required yard setback without a separate variance.
What if my cistern is bigger than 600 gallons?
It can still sit in a setback, but it cannot cover more than 10 percent of that yard, must stay two and one-half feet from a side or rear lot line and 15 feet from the front lot line, and a front-yard unit needs architectural compatibility or screening approved by the Director.
Does Shoreline give any financial incentive for harvesting rainwater?
New or remodeled commercial buildings with a properly sized rainwater harvesting system get a 10 percent reduction in their surface water management fee under SMC § FEE.120(B)(4), and the City will consider a larger reduction based on how much water is actually harvested.

Sources & Official References

Other rules in Shoreline

All Shoreline rules

Compare Shoreline to another location·View the Washington landscaping rules overview

Get notified when Rainwater Harvesting in Shoreline, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Rainwater Harvesting in Nearby Cities

How other cities in King County handle rainwater harvesting.

Kent, WA
Light Restrictions
Seattle, WA
Light Restrictions
Kirkland, WA
Few Restrictions
Bellevue, WA
Few Restrictions