Madera, CA Noise Ordinances: Construction Hours (2026)
Construction hours in Madera, CA, sometimes called construction noise rules or contractor work-hour ordinances, set when contractors can run power tools, hammers, and heavy equipment.
Key Facts
- Construction/demolition curfew
- 8:00 p.m. to 6:00 a.m. (§ 3-11.02(B))
- Power tools/lawn equipment curfew
- 10:00 p.m. to 6:00 a.m. (§ 3-11.02(C))
- Exemption authority
- Community Development Director, good cause only
- First violation
- infraction (§ 3-11.04)
- Repeat within 12 months
- misdemeanor
Summary
Madera bars noisy construction, drilling, remodeling, paving, grading or demolition work between 8:00 p.m. and 6:00 a.m. under § 3-11.02(B), and gives power tools and lawn or garden equipment a separate, later curfew of 10:00 p.m. to 6:00 a.m. under § 3-11.02(C).
(B) Between the hours of 8:00 p.m. and 6:00 a.m. of the following day. Noise sources associated with operating or causing the operation of any tools or equipment used in construction, drilling, repair, alteration, remodeling, paving, or grading of any real property or demolition work which creates sound which is in violation of § 3-11.01 of this title is prohibited. Provided, however, the Community Development Director or their designated representative may, for good cause, exempt certain construction work from the provisions of this chapter for a limited time when an unforeseen or unavoidable condition occurs during a construction project and the nature of the project necessitates that work in process be continued until a specific phase is completed.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2024 S-50: Current through Ordinance 1010 C.S., passed 6-5-24).
Full Breakdown
Chapter 11's construction rule sits inside the same Specific Noise Prohibitions section that covers amplified sound. Subsection (B) prohibits operating tools or equipment used in construction, drilling, repair, alteration, remodeling, paving, grading or demolition between 8:00 p.m. and 6:00 a.m. of the following day whenever the resulting sound violates the general unlawful-noise standard in § 3-11.01. The code builds in a narrow escape valve: the Community Development Director or a designated representative may grant a good-cause, limited-time exemption when an unforeseen or unavoidable condition arises mid-project and the work must continue past 8 p.m. to finish a specific phase without jeopardizing inspection, acceptance, or creating undue financial hardship for the contractor or owner.
Subsection (C) gives a narrower category, mechanically powered saws, drills, grinders, and lawn or garden tools, a different and later curfew: those tools are barred only between 10:00 p.m. and 6:00 a.m., two hours later than the general construction cutoff. Both subsections were adopted with the original 1994 noise ordinance and amended by Ord. 834 C.S. in 2008. Neither subsection sets a start-of-day limit; work is unrestricted from 6:00 a.m. up to the applicable evening cutoff.
Violations & Fines
A first violation of § 3-11.02(B) or (C) is an infraction under § 3-11.04. A second violation within twelve months of a prior conviction or bail forfeiture for any Chapter 11 offense becomes a misdemeanor, and the Community Development Director's exemption is discretionary, not automatic.
Frequently Asked Questions
What hours can construction crews work in Madera?
Can a contractor ever legally work past 8 p.m.?
Are lawnmowers covered by the same 8 p.m. curfew as construction?
Sources & Official References
Other rules in Madera
California rules heatmap·Compare Madera to another location·View the California noise ordinances overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.