York County, VA Parking Rules: Driveway Rules (2026)
Key Facts
- Precondition for building permit
- VDOT culvert permit
- Precondition for certificate of occupancy
- documented culvert installation
- Governing section
- York County Code § 7.1-15
- Enforcing office
- building code official
- Applies to
- new buildings/structures needing a driveway culvert
Summary
In York County, Virginia no building permit can issue for new construction needing a driveway culvert pipe until the owner shows a Virginia Department of Transportation permit for that pipe, under County Code § 7.1-15(a), and the county holds the certificate of occupancy until the culvert's installation is documented.
(a)No permit shall be issued for the erection or construction of any new building or structure requiring the installation of a culvert pipe for a driveway unless the owner of such property provides evidence that a permit has been issued by the Virginia Department of Transportation.(b)Where Virginia Department of Transportation approval is subject to the issuance of permit, the building code official shall require documentation that the culvert pipe has been installed pursuant to the requirement of the Virginia Department of Transportation before the issuance of the Certificate of Occupancy is issued.
Full Breakdown
Section 7.1-15 sits in Article III's Supplemental Regulations alongside the county's other outside-agency gatekeeping rules: § 7.1-13 blocks utility hookups until electrical or gas piping is county-approved, and § 7.1-16 blocks permits for new construction needing wastewater disposal until sewer connection or septic approval is shown. For driveways specifically, subsection (a) makes VDOT permit evidence a precondition to the county issuing any building permit for new construction that requires a culvert pipe. Subsection (b) then closes the loop at the back end of the project: where VDOT approval was conditioned on a permit, the building code official must get documentation that the culvert pipe was actually installed as VDOT required before the certificate of occupancy can be issued.
In practice this means a property owner adding a driveway crossing a county ditch or right-of-way has two checkpoints to clear with the state highway agency, once before the county will start the building permit, and again before the county will sign off on final occupancy, rather than a single filing.
Violations & Fines
Because the culvert pipe permit is a precondition under § 7.1-15 rather than a standalone offense, the practical consequence of skipping it is that the county withholds both the building permit and, later, the certificate of occupancy until VDOT documentation is produced. If construction proceeds without the required underlying building permit anyway, that separately violates § 7.1-59, punishable by a fine up to the maximum permitted by § 36-106 of the Code of Virginia, with each day of continued violation a separate offense.
Frequently Asked Questions
Can I get a York County building permit before my VDOT driveway culvert permit?
Does York County check that the driveway culvert was actually installed?
Why does York County tie a driveway rule to a state agency?
Sources & Official References
Other rules in York County
Compare York County to another location·View the Virginia parking rules overview