Skip to main content
CityRuleLookup

Elgin, IL Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Section
Elgin Municipal Code § 19.45.088
Single-family trigger date
Permits issued on/after Jan. 1, 2024
Multi-unit trigger date
Permits issued on/after April 1, 2024
State law referenced
765 ILCS 1085, EV Charging Act
Max parking-stall reduction
5% on lots over 25 spaces
Adopting ordinance
Ord. No. G53-23, 12-20-2023

Summary

Elgin requires EV-capable parking stalls on new single-family homes permitted on or after January 1, 2024, and new multi-unit residential buildings permitted on or after April 1, 2024. Developers can also trade up to 5% of required parking stalls for Level 2 or DC fast chargers on lots over 25 spaces.

A.Newly constructed single-family homes for which an initial building permit is applied for and issued on or after January 1, 2024, and multi-unit residential buildings for which an initial building permit is applied for and issued on or after April 1, 2024, that have parking spaces as defined by the State of Illinois Electric Vehicle Charging Act, 765 ILCS/1085, shall provide EV-capable parking stalls in accordance with said Act.B.The development administrator may allow a reduction of the required number of off-street parking stalls by up to five (5) percent where the number of parking spaces required by section 19.45.070 is greater than twenty-five (25) or where an existing parking facility contains more than twenty-five (25) parking spaces for the purpose of providing the commensurate number of level 2 or direct current fast chargers (DCFC) electric vehicle charging stations.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 7).

Full Breakdown

088, adopted by Ordinance No. G53-23 on December 20, 2023, any newly constructed single-family home for which an initial building permit is applied for and issued on or after January 1, 2024, and any multi-unit residential building for which an initial building permit is applied for and issued on or after April 1, 2024, must provide EV-capable parking stalls if the project has parking spaces as defined by the state Electric Vehicle Charging Act, 765 ILCS 1085. That state law sets the technical wiring/conduit standard; Elgin's ordinance is what triggers the local building-permit obligation to comply with it.

070 exceeds 25 spaces, or where an existing parking facility already has more than 25 spaces, as long as the freed-up spaces are replaced with an equal number of Level 2 or direct current fast charger (DCFC) electric vehicle charging stations. The code gives a worked example: a 100-space lot can drop to 95 standard spaces if 5 of the remaining 95 are equipped with Level 2 or DCFC chargers. 45, so it does not stack with other parking reductions unless the development administrator approves it.

Because the mandate is tied to building-permit issuance dates rather than existing structures, homes and residential buildings permitted before the 2024 thresholds are not required to retrofit EV-capable stalls under this section.

Violations & Fines

Compliance is checked at building-permit and site-plan review, not through after-the-fact fines: a qualifying single-family or multi-unit residential permit application dated on or after the 2024 thresholds will not clear plan review without the required EV-capable stalls. For the commercial parking-reduction incentive, any developer who takes the 5% stall reduction under 19.45.088.B must actually install the corresponding Level 2 or DCFC chargers; the development administrator ties approval of the reduced parking count to that installation, and the site plan is evaluated against the standard count in section 19.45.070 if the chargers are not provided.

Frequently Asked Questions

Does Elgin require EV charging wiring in new houses?
Yes. Any single-family home with an initial building permit applied for and issued on or after January 1, 2024 must provide EV-capable parking stalls that meet the state Electric Vehicle Charging Act, 765 ILCS 1085, under Elgin Municipal Code section 19.45.088.
When did the multi-unit residential EV requirement start in Elgin?
Multi-unit residential buildings are covered once an initial building permit is applied for and issued on or after April 1, 2024, three months after the single-family trigger date set in the same ordinance, section 19.45.088.A.
Can an Elgin parking lot reduce spaces to add chargers?
Yes. Section 19.45.088.B lets the development administrator cut required off-street stalls by up to 5% on lots with more than 25 required or existing spaces, provided the reduction equals the number of new Level 2 or DCFC charging stations installed.
Does the EV rule apply to existing Elgin homes?
No. The mandate attaches to the building-permit application date under section 19.45.088.A, so single-family and multi-unit buildings permitted before the 2024 thresholds have no retrofit obligation under this section.

Sources & Official References

Other rules in Elgin

All Elgin rules

Compare Elgin to another location·View the Illinois parking rules overview

Get notified when EV Charging in Elgin, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

EV Charging in Nearby Cities

How other cities in this county handle ev charging.

Aurora, IL
Some Restrictions