Huntsville, AL Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Trigger
100+ required parking spaces
Spaces required
2, then 1 per 50 more
Setback
50 feet from any structure
Charger install
Not required, readiness only
Adopted
Ord. No. 24-287, May 2024

Summary

Large parking lots in Huntsville must set aside EV-capable spaces with electrical capacity for future chargers once the site tops 100 required parking spaces, though no charger has to be installed yet.

Where the required number of parking spaces equals 100 or more spaces then two electric vehicle capable spaces shall be identified, and one additional space shall be identified per 50 thereafter. The following standards are applicable:

70.3.1. These locations shall be installed with electrical panel space and load capacity to support a branch circuit and necessary raceways, both underground and/or surface mounted to support electric vehicle supply equipment (EVSE), which shall meet the electrical and conduit regulations and specifications as established by the governing electrical utility provider ; and

70.3.2. Electric vehicle capable spaces shall be located at a minimum distance of 50 feet from any structure.

The above regulations do not require the installation of an electric charging station; however, it provides for a natural progression and location of appropriate infrastructure as technology advances.

(Ord. No. 24-287, § 1, 5-23-2024)

Source: Huntsville Utilities EVView official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 30 Update 2).

Full Breakdown

Huntsville's Zoning Ordinance (Appendix A, Article 70) requires new developments to build in electric-vehicle capacity once a site's required parking hits 100 spaces: two EV-capable spaces at that threshold, plus one more for every additional 50 spaces. Each space needs electrical panel space, load capacity and raceways sized for EV supply equipment per the utility's specs, and must sit at least 50 feet from any structure. The rule stops short of mandating an actual charging station, it only locks in the electrical infrastructure so a charger can be added later without ripping up the lot.

Violations & Fines

This is a site-design standard enforced through zoning site-plan review: plans missing the required EV-capable spaces won't clear approval, and permits won't issue until the plan adds them.

Frequently Asked Questions

Does Huntsville require electric car chargers at businesses?
No. The city only requires large lots (100+ spaces) to have EV-capable spaces wired and ready for future chargers: installing an actual charging station stays optional.
How many EV-ready spaces does a Huntsville development need?
Two once the site's required parking reaches 100 spaces, plus one more for every additional 50 spaces beyond that.

Sources & Official References

Other rules in Huntsville

All Huntsville rules

Compare Huntsville to another location·View the Alabama parking rules overview

Get notified when EV Charging in Huntsville, AL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.