Passaic, NJ Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Minimum space size (non-accessible)
9 ft wide × 18 ft long
Outlet mounting height
36–48 inches above ground
Bollard protection
3–4 ft, concrete-filled steel
Curb setback alternative to bollards
24 inches minimum
Maintenance contact
24-hour on-call number required

Summary

Every new EVSE and make-ready parking space in Passaic must meet design, safety and signage standards set by Code of the City of Passaic § 317-45, covering space dimensions, green pavement markings, protective bollards, cord management, and posted hours and fees.

Each EVSE or make-ready parking space that is not accessible for people with disabilities shall be not less than nine feet wide or 18 feet in length... Each publicly accessible EVSE shall be located at a parking space that is designated for electric vehicles only and identified by green painted pavement and/or curb markings, a green painted charging pictograph symbol, and appropriate signage... Adequate EVSE protection, such as concrete-filled steel bollards, shall be used for publicly accessible EVSE.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4978046; v41 updated 2026-07-01; through 07-01-2026).

Full Breakdown

§ 317-45 sets citywide standards that apply to all new electric vehicle charging installations, separate from the multifamily phase-in mandate in § 317-43. C. 5:23. On safety, every publicly accessible EVSE space must be marked with green painted pavement or curb markings and a green charging pictograph, and needs adequate lighting, landscaping, and protection such as concrete-filled steel bollards three to four feet high, or curbing if the EVSE sits back at least 24 inches from the curb face. Outlets and connectors must mount between 36 and 48 inches off the ground with a cord management system so cords don't cross a driveway, sidewalk or passenger unloading area, and publicly accessible EVSE needs a 24-hour on-call contact posted on the equipment for reporting outages.

On signage, publicly accessible spaces must post regulatory signs limiting parking to actively charging vehicles, meeting federal Manual on Uniform Traffic Control Devices standards, plus posted hours of operation or time limits, usage and parking fees, and a contact phone number. Electric vehicles may park in any space designated for parking generally, subject to the same restrictions as any other vehicle. Fee-wise, drivers using metered municipal EVSE pay the standard metered fee, adjustable only by resolution of the governing body, while private EVSE owners may charge their own fee under state and federal rules as long as it's posted at the equipment.

Violations & Fines

EVSE installations that don't meet § 317-45's dimension, signage or safety standards are enforced by the Zoning Official under § 317-42D with the same penalties as other Land Use Regulation violations, including the § 1-3 general penalty of a fine up to $2,000, imprisonment up to 90 days, or up to 90 days of community service.

Frequently Asked Questions

How big must an EV charging parking space be in Passaic?
At least nine feet wide and 18 feet long for a non-accessible space under § 317-45A(2), with accessible spaces sized per the Uniform Construction Code's accessibility standards instead.
Do Passaic EV charging spaces need special pavement markings?
Yes. § 317-45B(1) requires publicly accessible EVSE spaces to be marked with green painted pavement or curb markings and a green charging pictograph symbol, plus regulatory signage.
Who pays to use a public EV charger in Passaic?
Drivers using metered municipal EVSE pay the standard metered fee, which can only be changed by resolution of the governing body, per § 317-45E. Private EVSE owners may set and post their own fee.

Sources & Official References

Other rules in Passaic

All Passaic rules

Compare Passaic to another location·View the New Jersey parking rules overview

Get notified when EV Charging in Passaic, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.